SPT-Based Soil Liquefaction Triggering Calculator (CSR, CRR & FS_liq)
Evaluates earthquake-induced liquefaction triggering from Standard Penetration Test blow counts with US customary inputs (ft, pcf, g). The calculation core computes the energy-corrected N_60, the overburden factor C_N, the fines-corrected (N_1)_60cs, CSR, MSF and FS_liq by NCEER (Youd et al. 2001), checks FS_liq ≥ 1.00, and lists the JRA, AIJ and HBF methods alongside for comparison.
Standards and references (context for this calculation; the basis the calculator applies is the one stated below):
Design basis as reported by the calculation core: NCEER / Youd et al. (2001) Simplified SPT Liquefaction Procedure & AASHTO LRFD Bridge Design Specifications Art. 10.5.4
Recalculates in your browser as you edit inputs; Free sample Word report and DXF for this calculator; With a license: formal Word and DXF export, plus online project reports from the Project List.
Check Summary Preview (Software Format; Auto-Populated)
| Check item | Trial value | Status |
|---|---|---|
| Liquefaction Factor of Safety FS_liq (NCEER / Youd 2001) | 1.206 ≥ 1.00 | OK |
Summary of the online calculation (software format) for checking by the designer and an independent checker. Final submittals require review and seal by the licensed Professional Engineer in responsible charge.
Desktop edition: calculation reports and cross-module quantity reconciliation
1. Calculation reports: with a license, the desktop edition writes Word (.docx) and Excel (.xlsx) calculation reports and DXF drawings without the trial watermark, listing the inputs, the equations used and the results; in trial mode the step-by-step detail is hidden. For this calculator alone, licensed users can also sign in on the calculator above and formally export a single-tool Word report (with a verification code) and DXF drawing. The Pro plan (all modules) is US$990 per year; see Pricing for monthly, perpetual and team plans.
2. Cross-module reconciliation: desktop project runs carry the design peak flow into downstream channel, culvert and bridge hydraulics; terrain cut/fill into the earthwork balance, cost and carbon tables; structural concrete, formwork and rebar take-off into the cost and carbon tables; slope and excavation safety-factor thresholds into construction monitoring trigger levels.
3. Agency plan reviewers and university faculty can request a complimentary review or teaching license (link below).
Governing Equations (US Customary Notation) & Basis Reported by the Calculation Core
The equations and limits the calculation core applies are listed below for independent checking.
Worked Example: SPT Liquefaction Evaluation at z = 20.0 ft (ER = 80%)
The worked example below was computed by the calculation core when this page was built; entering the same inputs above reproduces it. Verification cases, tolerances and actual differences for the calculation core are listed on the Benchmarks page.
Evaluate the liquefaction factor of safety FS_liq at a depth of 20.0 ft (water table at 6.0 ft) in silty sand with field N = 14 blows/ft, hammer energy ratio 80%, FC = 15%, γ_t = 115 pcf, γ_sat = 125 pcf, a_max = 0.30g and M_w = 7.0.
Every number in this example was produced by the calculation core (WebAssembly) when this page was built. The calculation core works in SI units: the US customary inputs below are converted with exact NIST SP 811 factors before the calculation, and results are shown in US customary units with the core's SI value in parentheses. Check values, criteria and calculation steps are the core's own SI output. Basis reported by the core: NCEER / Youd et al. (2001) Simplified SPT Liquefaction Procedure & AASHTO LRFD Bridge Design Specifications Art. 10.5.4
1. Input Parameters
| Design Parameter | US Customary Value | Unit |
|---|---|---|
| SPT Sample Depth z | 20 | ft |
| Measured Field SPT N-Value | 14 | — |
| Hammer Energy Ratio ER | 80 | % |
| Fines Content FC (Passing #200) | 15 | % |
| Groundwater Table Depth D_w | 6 | ft |
| Moist Unit Weight Above GWT γ_t | 115 | pcf |
| Saturated Unit Weight Below GWT γ_sat | 125 | pcf |
| Peak Ground Acceleration a_max | 0.3 | g |
| Design Moment Magnitude M_w | 7 | — |
| Reference Pressure Pa (overburden correction) | Pa = 100 kPa (≈ 1 atm) | — |
2. Computed Results (calculation core output)
| Output | Result |
|---|---|
| FS_liq (NCEER / Youd 2001) | 1.206 |
| FS_liq (JRA Method) | 0.728 |
| FS_liq (AIJ Method) | 1.803 |
| FS_liq (HBF Method) | 1.278 |
Verification Checks (calculation core output)
| Verification Item | Computed Result | Governing Limit / Criterion | Status | Basis |
|---|---|---|---|---|
| Liquefaction Factor of Safety FS_liq (NCEER / Youd 2001) | 1.206 | ≥ 1.00 | PASS | Youd et al. (2001) JGGE & AASHTO LRFD Art. 10.5.4 |
3. Calculation Steps (calculation core output, SI units)
[HyGeoWorks online preview - not for PE sealing or submittal] Total overburden stress σv0 = 18.0651×1.8288 + 19.6359×4.27 = 116.83 kPa; Effective stress σ'v0 = 74.97 kPa NCEER (Youd et al., 2001): N60 = N·ER/60 = 18.67, CN = 1.155, (N1)60cs = 25.10, MSF = 1.193, CRR7.5×MSF = 0.3507, rd = 0.957, CSR = 0.65·(amax/g)·(σv0/σ'v0)·rd = 0.2908 → FS_liq = CRR / CSR = 1.206
Multi-Method Liquefaction Triggering Comparison (4 rows)
| Method | N60 / N72 | CN | (N1) | (N1)60cs / Na | MSF | CRR | rd | CSR | FS_liq |
|---|---|---|---|---|---|---|---|---|---|
| NCEER (Youd 2001) | 18.67 | 1.155 | 21.57 | 25.10 | 1.193 | 0.3507 | 0.957 | 0.2908 | 1.206 |
| JRA (Road Bridge Spec.) | 15.56 | - | 18.06 | 20.14 | - | 0.3093 | 0.909 | 0.4248 | 0.728 |
| AIJ (Arch. Inst. Japan) | 15.56 | 1.155 | 17.97 | 24.97 | - | 0.4595 | 0.909 | 0.2549 | 1.803 |
| HBF (Hyperbolic) | 18.67 | 1.155 | 21.57 | 24.94 | 1.132 | 0.3648 | 0.939 | 0.2854 | 1.278 |
Assumptions and Limits Stated by the Calculation Core
- NCEER & HBF use N60 energy normalization; AIJ & JRA use Japanese N72 practice.
Frequently Asked Questions (Basis, Scope & Limits)
Common questions about this calculator and its basis are answered below. Final submittals require review and seal by a licensed Professional Engineer.
Why does the hammer energy ratio ER matter?
The NCEER procedure is calibrated to N_60, the blow count at 60% of the theoretical hammer energy. Automatic hammers often deliver more energy than 60%, so the field N must be scaled by ER/60 before the overburden and fines corrections. Enter the energy ratio measured or documented for the hammer used in the boring.
Where do I obtain a_max and M_w?
Both are inputs. Use the site-adjusted peak ground acceleration and the design earthquake magnitude required by the seismic code governing the project (for example the hazard data your State DOT or building code specifies); the calculator does not look up seismic hazard.
Does this tool screen plastic clays and silts differently from sands?
No. The SPT triggering procedures apply to sands and non-plastic to low-plasticity silty soils; the calculator does not screen soils by plasticity. Plastic fine-grained soils require a separate cyclic softening evaluation.
Can the HydroStudio desktop edition evaluate a full boring log?
Yes. The HydroStudio desktop edition evaluates multi-layer SPT boring logs and computes the liquefaction potential index PL = ∫ F(z)·(10 − 0.5z) dz over the top 20 m (F = 1 − FL where FL < 1), as defined in the Taiwan Building Foundation Design Code, with the same four triggering methods.
From the Online Preview to the HydroStudio Desktop Edition: Reports Without the Trial Watermark
The free online preview is not for PE sealing or submittal and has no Word report, DXF drawing or verification code. Licensed users can sign in on the calculator and formally export a single-tool Word report (with a verification code) and DXF drawing. Several calculators can be combined in the Project List and exported online as a multi-chapter project report, and projects with terrain or GIS files can run in the heavy cloud computation. For interactive 2D models and large simulations, the HydroStudio desktop edition (Windows 10/11, 64-bit) opens the exported .toml project and, with a license, writes report.docx, a report.xlsx with live formulas and DXF drawings without the trial watermark. Sealing and submittal remain the responsibility of the licensed engineer.
Compare all plans, including 90-day passes and perpetual licenses