Embodied Carbon Screening (Materials, Transport, Construction) with GSA IRA Low Embodied Carbon Limits
Carbon emissions of concrete, rebar, spoil haulage, plant diesel and site electricity, totalled by stage (materials, transport, site construction).
Design basis as reported by the calculation core: US EPA GHG Emission Factors Hub (2025), eGRID2023 Rev. 2 & GSA IRA Low Embodied Carbon Concrete and Steel Requirements (Dec. 12, 2023) (17 U.S.C. Sec. 105)
Only the materials, transport and construction stages are calculated; this is a screening estimate, not a whole-life assessment. Emission factors and their source are the public datasets named in the basis line, which differ by market edition; in the US edition the GSA IRA concrete and steel GWP limits are checked only when a product EPD value is entered. The input list keeps the Taiwan concrete strength classes (140–280 kgf/cm²) and the SD280 rebar label; check that the factors suit your materials.
Recalculates in your browser as you edit inputs; Free sample Word report and DXF for this calculator; With a license: formal Word and DXF export, plus online project reports from the Project List.
Check Summary Preview (Software Format; Auto-Populated)
| Check item | Trial value | Status |
|---|---|---|
| Total Carbon Emissions | 355.66 tCO2e | Calculated value |
| Materials (A1-A3) | 332.88 tCO2e | Calculated value |
| Transport (A4) | 13.87 tCO2e | Calculated value |
| Site Construction (A5) | 8.91 tCO2e | Calculated value |
Summary of the online calculation (software format) for checking by the designer and an independent checker. Final submittals require review and seal by the licensed Professional Engineer in responsible charge.
Desktop edition: calculation reports and cross-module quantity reconciliation
1. Calculation reports: with a license, the desktop edition writes Word (.docx) and Excel (.xlsx) calculation reports and DXF drawings without the trial watermark, listing the inputs, the equations used and the results; in trial mode the step-by-step detail is hidden. For this calculator alone, licensed users can also sign in on the calculator above and formally export a single-tool Word report (with a verification code) and DXF drawing. The Pro plan (all modules) is US$990 per year; see Pricing for monthly, perpetual and team plans.
2. Cross-module reconciliation: desktop project runs carry the design peak flow into downstream channel, culvert and bridge hydraulics; terrain cut/fill into the earthwork balance, cost and carbon tables; structural concrete, formwork and rebar take-off into the cost and carbon tables; slope and excavation safety-factor thresholds into construction monitoring trigger levels.
3. Agency plan reviewers and university faculty can request a complimentary review or teaching license (link below).
Standard example (calculation core defaults)
The worked example below was computed by the calculation core when this page was built; entering the same inputs above reproduces it. Verification cases, tolerances and actual differences for the calculation core are listed on the Benchmarks page.
The standard example uses the default inputs of the calculation core. Every number below was produced by the core when this page was built; nothing on this page is computed by hand.
Every number in this example was produced by the calculation core (WebAssembly) when this page was built. This calculator computes to the documents named in its basis line and works in SI units; use the unit button in the calculator to view US customary equivalents. Basis reported by the core: US EPA GHG Emission Factors Hub (2025), eGRID2023 Rev. 2 & GSA IRA Low Embodied Carbon Concrete and Steel Requirements (Dec. 12, 2023) (17 U.S.C. Sec. 105)
1. Input Parameters
| Design Parameter | Value | Unit |
|---|---|---|
| Concrete Strength | 280 kgf/cm² | — |
| Concrete Volume | 1000 | m³ |
| Rebar Quantity | 80 | t |
| Spoil Hauled Off Site | 5000 | m³ |
| Spoil Bulk Density | 1.8 | t/m³ |
| One-Way Haul Distance | 12 | km |
| Plant Diesel | 2000 | L |
| Site Electricity | 10000 | kWh |
| Low-Carbon Alternative | No comparison | — |
| Allocated Carbon Budget | (blank) | tCO2e |
| Specified Concrete Emission Factor | (blank) | kgCO2e/m³ |
2. Computed Results (calculation core output)
| Output | Result |
|---|---|
| Total Carbon Emissions | 355.66 tCO2e |
| Materials (A1-A3) | 332.88 tCO2e |
| Transport (A4) | 13.87 tCO2e |
| Site Construction (A5) | 8.91 tCO2e |
3. Calculation Steps (calculation core output, SI units)
[HyGeoWorks online preview - not for PE sealing or submittal]
Stage-by-Stage Carbon Breakdown (5 rows)
| Item | Quantity | Unit | Factor (kgCO2e/unit) | Emissions (tCO2e) | Source |
|---|---|---|---|---|---|
| Concrete | 1000.0 | m3 | 284.000 | 284.00 | GSA IRA Low Embodied Carbon Concrete Requirements (Dec. 12, 2023), 4000 psi Top 20% Limit used as benchmark (284.0 kgCO2e/m3; Top 40% 326.0; Better Than Average 352.0) |
| Reinforcing Steel | 80.0 | t | 611.000 | 48.88 | GSA IRA Low Embodied Carbon Steel Requirements (Dec. 12, 2023), Unfabricated Rebar Top 20% Limit (611.0 kgCO2e/t) |
| Earthwork Haulage | 108000.0 | t-km | 0.1284 | 13.87 | US EPA GHG Emission Factors Hub (2025), Medium- and Heavy-Duty Truck (0.1875 kgCO2e/short ton-mile / 1.459972 t-km per short ton-mile = 0.1284 kgCO2e/t-km) |
| Non-Road Diesel | 2000.0 | L | 2.705 | 5.41 | US EPA GHG Emission Factors Hub (2025), Distillate Fuel Oil No. 2, total CO2e (10.24 kgCO2e/gal / 3.785411784 L/gal = 2.705 kgCO2e/L) |
| Site Electricity | 10000.0 | kWh | 0.350 | 3.50 | US EPA eGRID2023 Rev. 2, U.S. total output emission rate (770.884 lb CO2e/MWh = 0.350 kgCO2e/kWh) |
Assumptions and Limits Stated by the Calculation Core
- No GSA limit check is made: the concrete factor above is the GSA Top 20% limit used as a benchmark, not a product value. Enter the product EPD GWP in "Specified Concrete Emission Factor" to compare it with the GSA IRA 4000 psi Better Than Average Limit (352.0 kgCO2e/m3).
- Public domain federal data pursuant to 17 U.S.C. Sec. 105 (US EPA GHG Emission Factors Hub, eGRID & GSA IRA Low Embodied Carbon Requirements).
Frequently Asked Questions
Common questions about this calculator and its basis are answered below. Final submittals require review and seal by a licensed Professional Engineer.
Which design basis does this calculator apply?
US EPA GHG Emission Factors Hub (2025), eGRID2023 Rev. 2 & GSA IRA Low Embodied Carbon Concrete and Steel Requirements (Dec. 12, 2023) (17 U.S.C. Sec. 105). Only the materials, transport and construction stages are calculated; this is a screening estimate, not a whole-life assessment. Emission factors and their source are the public datasets named in the basis line, which differ by market edition; in the US edition the GSA IRA concrete and steel GWP limits are checked only when a product EPD value is entered. The input list keeps the Taiwan concrete strength classes (140–280 kgf/cm²) and the SD280 rebar label; check that the factors suit your materials.
What assumptions and limits does the calculation core state for this tool?
No GSA limit check is made: the concrete factor above is the GSA Top 20% limit used as a benchmark, not a product value. Enter the product EPD GWP in "Specified Concrete Emission Factor" to compare it with the GSA IRA 4000 psi Better Than Average Limit (352.0 kgCO2e/m3). Public domain federal data pursuant to 17 U.S.C. Sec. 105 (US EPA GHG Emission Factors Hub, eGRID & GSA IRA Low Embodied Carbon Requirements).
Where is the calculation performed, and can the result be sealed or submitted?
The calculation runs in your browser, in the same WebAssembly calculation core this page loads. The result is an online preview: its first line reads "[HyGeoWorks online preview - not for PE sealing or submittal]".
Can I recalculate without a network connection?
Yes. "Download the offline workbench" on this page saves one HTML file that contains the workbench and the same calculation core; opened from disk it recalculates without a network connection.
From the Online Preview to the HydroStudio Desktop Edition: Reports Without the Trial Watermark
The free online preview is not for PE sealing or submittal and has no Word report, DXF drawing or verification code. Licensed users can sign in on the calculator and formally export a single-tool Word report (with a verification code) and DXF drawing. Several calculators can be combined in the Project List and exported online as a multi-chapter project report, and projects with terrain or GIS files can run in the heavy cloud computation. For interactive 2D models and large simulations, the HydroStudio desktop edition (Windows 10/11, 64-bit) opens the exported .toml project and, with a license, writes report.docx, a report.xlsx with live formulas and DXF drawings without the trial watermark. Sealing and submittal remain the responsibility of the licensed engineer.
Compare all plans, including 90-day passes and perpetual licenses