Steep Roadside Channel & Stepped Check-Drop Layout Calculator
Solves the slope-flattening and series check-drop layout of steep ditches with US customary inputs (ft, cfs, fps). The calculation core finds the reach slope at which the Manning velocity equals the maximum permissible velocity (from the Taiwan Soil and Water Conservation Technical Regulations Art. 85 when a lining is selected, or the value you enter), sets the drop height at your drop spacing per the Taiwan Soil and Water Conservation Handbook §2.20, and counts the drops over the reach.
Standards and references (context for this calculation; the basis the calculator applies is the one stated below):
Design basis as reported by the calculation core: Manning Uniform Flow; maximum permissible velocity per Taiwan Soil and Water Conservation Technical Regulations Art. 85; drop layout per Taiwan Soil and Water Conservation Handbook, Engineering Part §2.20
Recalculates in your browser as you edit inputs; Free sample Word report and DXF for this calculator; With a license: formal Word and DXF export, plus online project reports from the Project List.
Check Summary Preview (Software Format; Auto-Populated)
| Check item | Trial value | Status |
|---|---|---|
| Mild-Reach Flow Velocity | 3.046 m/s ≤ 3.048 m/s | OK |
Summary of the online calculation (software format) for checking by the designer and an independent checker. Final submittals require review and seal by the licensed Professional Engineer in responsible charge.
Desktop edition: calculation reports and cross-module quantity reconciliation
1. Calculation reports: with a license, the desktop edition writes Word (.docx) and Excel (.xlsx) calculation reports and DXF drawings without the trial watermark, listing the inputs, the equations used and the results; in trial mode the step-by-step detail is hidden. For this calculator alone, licensed users can also sign in on the calculator above and formally export a single-tool Word report (with a verification code) and DXF drawing. The Pro plan (all modules) is US$990 per year; see Pricing for monthly, perpetual and team plans.
2. Cross-module reconciliation: desktop project runs carry the design peak flow into downstream channel, culvert and bridge hydraulics; terrain cut/fill into the earthwork balance, cost and carbon tables; structural concrete, formwork and rebar take-off into the cost and carbon tables; slope and excavation safety-factor thresholds into construction monitoring trigger levels.
3. Agency plan reviewers and university faculty can request a complimentary review or teaching license (link below).
Governing Equations (US Customary Notation) & Basis Reported by the Calculation Core
The equations and limits the calculation core applies are listed below for independent checking.
Worked Example: Check Drops on a 300-ft Ditch at a 10% Grade (Q = 40 cfs)
The worked example below was computed by the calculation core when this page was built; entering the same inputs above reproduces it. Verification cases, tolerances and actual differences for the calculation core are listed on the Benchmarks page.
A concrete trapezoidal ditch (b = 4.0 ft, 1.5H:1V, n = 0.015) on a 10.0% grade carries Q = 40 cfs. Limit the reach velocity to a user-specified V_max of 10.0 fps using check drops spaced every 50 ft over a 300-ft reach.
Every number in this example was produced by the calculation core (WebAssembly) when this page was built. The calculation core works in SI units: the US customary inputs below are converted with exact NIST SP 811 factors before the calculation, and results are shown in US customary units with the core's SI value in parentheses. Check values, criteria and calculation steps are the core's own SI output. Basis reported by the core: Manning Uniform Flow; maximum permissible velocity per Taiwan Soil and Water Conservation Technical Regulations Art. 85; drop layout per Taiwan Soil and Water Conservation Handbook, Engineering Part §2.20
1. Input Parameters
| Design Parameter | US Customary Value | Unit |
|---|---|---|
| Channel Cross-Section | Trapezoidal Ditch | — |
| Bottom Width b | 4 | ft |
| Side Slope z (zH:1V) | 1.5 | — |
| Manning's Roughness n | 0.015 | — |
| Existing Ground Grade S_0 | 0.1 | m/m |
| Design Discharge Q | 40 | cfs |
| Channel Lining Material | Custom maximum permissible velocity | — |
| Max Permissible Velocity V_max | 10 | ft/s |
| Perennial Flow | No | — |
| Station Spacing Between Drops s | 50 | ft |
| Total Steep Reach Length L | 300 | ft |
2. Computed Results (calculation core output)
| Output | Result |
|---|---|
| Number of Drops | 6 units |
| Unchecked Ground-Slope Velocity | 17.13 ft/s (5.220 m/s) |
| Mild-Reach Bed Slope Sb | 0.02060 m/m |
| Unit Drop Height H | 3.97 ft (1.21 m) |
| Mild-Reach Normal Depth yn | 0.7753 ft (0.2363 m) |
| Mild-Reach Velocity V | 9.992 ft/s (3.046 m/s) |
Verification Checks (calculation core output)
| Verification Item | Computed Result | Governing Limit / Criterion | Status | Basis |
|---|---|---|---|---|
| Mild-Reach Flow Velocity | 3.046 m/s | ≤ 3.048 m/s | PASS | User-specified |
3. Calculation Steps (calculation core output, SI units)
[HyGeoWorks online preview - not for PE sealing or submittal] Section: Trapezoidal b = 1.219 m, side slope 1:1.5; n = 0.015, Q = 1.13267 m³/s; Max. Permissible Velocity Vmax = 3.048 m/s (User-specified) Natural slope S0 = 0.1: V = 5.220 m/s > Vmax (drop cascade required) Mild-reach slope: solve Sb for V(Sb) = Vmax -> unit drop height H = ceil_cm((S0 - Sb)*s) = 1.21 m Sb = S0 − H/s = 0.1 − 1.21/15.24 = 0.02060; mild-reach yn = 0.2363 m, V = 3.046 m/s Drop count = ceil(channel length / spacing) = 6
US customary equivalents (NIST SP 811 conversion of the SI values reported by the core above; the core summary itself is unchanged) Unchecked Ground-Slope Velocity = 17.13 ft/s Unit Drop Height H = 3.97 ft Mild-Reach Normal Depth yn = 0.7753 ft Mild-Reach Velocity V = 9.992 ft/s
Assumptions and Limits Stated by the Calculation Core
- Size individual stilling basins using the Hydraulic Drop Structure tool (H = 1.21 m)
Frequently Asked Questions (Basis, Scope & Limits)
Common questions about this calculator and its basis are answered below. Final submittals require review and seal by a licensed Professional Engineer.
Why break a steep ditch into flatter reaches with check drops?
On a steep grade the unchecked velocity can be far above what the lining tolerates; the worked example reports the unchecked ground-slope velocity next to the flattened-reach velocity. Flattening the reaches between drops keeps the velocity at or below V_max and concentrates the energy loss at the drops, where it can be dissipated.
How do I choose the spacing between check drops?
Closer spacing gives lower individual drops and smaller drop structures; wider spacing gives fewer but higher drops. Try several spacings in the calculator and check each resulting drop height in the Drop Structure calculator, which limits a single drop to 3 m (9.84 ft).
Where does V_max come from?
This page uses the value you enter (10.0 fps in the worked example); enter the limit your agency sets for your lining. When the calculation core is given a lining type instead (not offered on this form), it applies the maximum permissible velocity of the Taiwan Soil and Water Conservation Technical Regulations Art. 85 for that lining.
Can I size the individual drop structures after running this layout?
Yes — take the computed drop height and open the Drop Structure & Stilling Basin Calculator (/us/tools/drop-structure/) to obtain the basin length, sill heights, wingwall widths and minimum RC slab thickness.
From the Online Preview to the HydroStudio Desktop Edition: Reports Without the Trial Watermark
The free online preview is not for PE sealing or submittal and has no Word report, DXF drawing or verification code. Licensed users can sign in on the calculator and formally export a single-tool Word report (with a verification code) and DXF drawing. Several calculators can be combined in the Project List and exported online as a multi-chapter project report, and projects with terrain or GIS files can run in the heavy cloud computation. For interactive 2D models and large simulations, the HydroStudio desktop edition (Windows 10/11, 64-bit) opens the exported .toml project and, with a license, writes report.docx, a report.xlsx with live formulas and DXF drawings without the trial watermark. Sealing and submittal remain the responsibility of the licensed engineer.
Compare all plans, including 90-day passes and perpetual licenses