Drop Structure & Grade-Control Plunge Pool Scour Depth Calculator
Side-by-side empirical plunge-pool scour calculator: from the unit discharge, head drop, tailwater depth and bed grain sizes, the calculation core evaluates the empirical formulas compiled in the Taiwan Soil and Water Conservation Bureau technical series No. 04 §4.6 Tables 4-9 and 4-10 (including Schoklitsch, Eggenberger, Veronese, Martins, Jaeger and Mason) and reports each formula's total scour depth, its net scour depth below the bed and the envelope maximum.
Standards and references (context for this calculation; the basis the calculator applies is the one stated below):
Design basis as reported by the calculation core: Empirical Jet Plunge Scour Formulas (Schoklitsch, Veronese, Mason & Arumugam, Martins, Jaeger) as compiled in Taiwan Soil and Water Conservation Bureau technical series No. 04, §4.6 Tables 4-9 and 4-10
Recalculates in your browser as you edit inputs; Free sample Word report and DXF for this calculator; With a license: formal Word and DXF export, plus online project reports from the Project List.
Check Summary Preview (Software Format; Auto-Populated)
| Check item | Trial value | Status |
|---|---|---|
| Envelope Max. Scour Depth d_s,max | 8.991 m | Calculated value |
Summary of the online calculation (software format) for checking by the designer and an independent checker. Final submittals require review and seal by the licensed Professional Engineer in responsible charge.
Desktop edition: calculation reports and cross-module quantity reconciliation
1. Calculation reports: with a license, the desktop edition writes Word (.docx) and Excel (.xlsx) calculation reports and DXF drawings without the trial watermark, listing the inputs, the equations used and the results; in trial mode the step-by-step detail is hidden. For this calculator alone, licensed users can also sign in on the calculator above and formally export a single-tool Word report (with a verification code) and DXF drawing. The Pro plan (all modules) is US$990 per year; see Pricing for monthly, perpetual and team plans.
2. Cross-module reconciliation: desktop project runs carry the design peak flow into downstream channel, culvert and bridge hydraulics; terrain cut/fill into the earthwork balance, cost and carbon tables; structural concrete, formwork and rebar take-off into the cost and carbon tables; slope and excavation safety-factor thresholds into construction monitoring trigger levels.
3. Agency plan reviewers and university faculty can request a complimentary review or teaching license (link below).
Governing Equations (US Customary Notation) & Basis Reported by the Calculation Core
The equations and limits the calculation core applies are listed below for independent checking.
Worked Example: Grade-Control Drop Scour Envelope (q = 20 cfs/ft, H_d = 10 ft)
The worked example below was computed by the calculation core when this page was built; entering the same inputs above reproduces it. Verification cases, tolerances and actual differences for the calculation core are listed on the Benchmarks page.
Evaluate plunge-pool scour below a 10-ft drop conveying 20 cfs per foot of crest into a 4.0-ft tailwater over gravel-cobble bed material (d_m = 3 in., d_90 = 6 in.).
Every number in this example was produced by the calculation core (WebAssembly) when this page was built. The calculation core works in SI units: the US customary inputs below are converted with exact NIST SP 811 factors before the calculation, and results are shown in US customary units with the core's SI value in parentheses. Check values, criteria and calculation steps are the core's own SI output. Basis reported by the core: Empirical Jet Plunge Scour Formulas (Schoklitsch, Veronese, Mason & Arumugam, Martins, Jaeger) as compiled in Taiwan Soil and Water Conservation Bureau technical series No. 04, §4.6 Tables 4-9 and 4-10
1. Input Parameters
| Design Parameter | US Customary Value | Unit |
|---|---|---|
| Unit Crest Discharge q | 20 | ft²/s |
| Head Drop H_d (Upstream to Downstream Water Level) | 10 | ft |
| Downstream Tailwater Depth h_t | 4 | ft |
| Mean Bed Grain Size d_m | 0.25 | ft |
| Bed Grain Size d_90 | 0.5 | ft |
2. Computed Results (calculation core output)
| Output | Result |
|---|---|
| Envelope Max. Scour Depth d_s,max | 29.5 ft (8.991 m) |
3. Calculation Steps (calculation core output, SI units)
[HyGeoWorks online preview - not for PE sealing or submittal]
US customary equivalents (NIST SP 811 conversion of the SI values reported by the core above; the core summary itself is unchanged) Envelope Max. Scour Depth d_s,max = 29.5 ft
Empirical Plunge Scour Formula Comparison (11 rows)
| Formula | ts (m) | Net Scour Depth d_se (m) | Reference / Applicability |
|---|---|---|---|
| Schoklitsch | 1.692 | 0.473 | Table 4-9 (grain size d90) |
| Eggenberger | 10.210 | 8.991 | Table 4-9 (grain size dm) |
| Taraimovich | 1.267 | 0.048 | Table 4-9 (grain size dm) |
| Machado | 2.950 | 1.731 | Table 4-9 (grain size d90) |
| Franke | 7.654 | 6.434 | Table 4-9 (grain size d90) |
| Chee & Padiyar | 4.628 | 3.409 | Table 4-9 (grain size dm) |
| Lapotuliv | 2.955 | 1.736 | Table 4-9 (grain size dm) |
| Veronese (1937) | 3.412 | 2.192 | Table 4-10 (upper-bound formula, ts ≤) |
| Martins (1975) | 2.432 | 1.213 | Table 4-10 |
| Jaeger | 2.160 | 0.941 | Table 4-10 (ht/d90) |
| Mason (1984) | 3.369 | 2.150 | Table 4-10 |
Assumptions and Limits Stated by the Calculation Core
- Empirical plunge-scour predictions vary widely with bed gradation and jet aeration; compare envelope and justify selected formula.
Frequently Asked Questions (Basis, Scope & Limits)
Common questions about this calculator and its basis are answered below. Final submittals require review and seal by a licensed Professional Engineer.
Why compare several empirical scour formulas?
Each formula was calibrated on different laboratory or field conditions and their predictions differ widely. The calculation core notes that empirical plunge-scour predictions vary with bed gradation and jet aeration, and that the envelope should be compared and the selected formula justified; the comparison table lists every formula with its source table.
What is the difference between total scour depth t_s and net scour depth d_se?
t_s is measured from the downstream tailwater surface to the deepest point of the scour hole, while d_se = t_s − h_t is the depth below the original streambed — the figure that matters for the foundation or cutoff depth of the structure.
How deep should a cutoff wall extend below the computed scour?
The calculator does not set an embedment depth or a safety factor. The embedment below the adopted scour depth, and any allowance for long-term bed degradation, follow the criteria of your governing agency.
Does a deeper tailwater reduce the net scour depth?
In these formulas, yes: a deeper tailwater cushions the plunging jet and is subtracted from t_s, reducing d_se = t_s − h_t, although turbulent jet diffusion still reaches the bed unless h_t exceeds t_s.
From the Online Preview to the HydroStudio Desktop Edition: Reports Without the Trial Watermark
The free online preview is not for PE sealing or submittal and has no Word report, DXF drawing or verification code. Licensed users can sign in on the calculator and formally export a single-tool Word report (with a verification code) and DXF drawing. Several calculators can be combined in the Project List and exported online as a multi-chapter project report, and projects with terrain or GIS files can run in the heavy cloud computation. For interactive 2D models and large simulations, the HydroStudio desktop edition (Windows 10/11, 64-bit) opens the exported .toml project and, with a license, writes report.docx, a report.xlsx with live formulas and DXF drawings without the trial watermark. Sealing and submittal remain the responsibility of the licensed engineer.
Compare all plans, including 90-day passes and perpetual licenses