Storm Sewer Longitudinal Profile, HGL & Utility Clearance Check
Slope, flow velocity and full-flow capacity of a storm sewer reach, hydraulic grade line (HGL) at the manholes with an optional downstream water level, minimum cover, manhole spacing, and vertical clearance to a crossing utility.
Design basis as reported by the calculation core: Taiwan Sewerage Engineering Facility Standards (amended 2025-11-04) Arts. 3-8; Manning flow and hydraulic grade line by the design-table method
Velocity, size, cover and manhole-spacing limits are those of the Taiwan sewer standard named in the basis line; check the requirements of your own authority separately.
Recalculates in your browser as you edit inputs; Free sample Word report and DXF for this calculator; With a license: formal Word and DXF export, plus online project reports from the Project List.
Check Summary Preview (Software Format; Auto-Populated)
| Check item | Trial value | Status |
|---|---|---|
| MH1→MH2 minimum design velocity | 2.81 m/s ≥ 0.80 m/s | OK |
| MH1→MH2 maximum design velocity | 2.81 m/s ≤ 3.00 m/s | OK |
| MH1→MH2 capacity (full-flow discharge ≥ design discharge) | 2.14 m³/s ≥ 1.20 m³/s | OK |
| MH1→MH2 minimum pipe diameter | 1.00 m ≥ 0.80 m | OK |
| MH1→MH2 minimum cover depth | 1.00 m ≥ 0.50 m | OK |
| MH1→MH2 manhole spacing | 40.00 m ≤ 150.00 m | OK |
Summary of the online calculation (software format) for checking by the designer and an independent checker. Final submittals require review and seal by the licensed Professional Engineer in responsible charge.
Desktop edition: calculation reports and cross-module quantity reconciliation
1. Calculation reports: with a license, the desktop edition writes Word (.docx) and Excel (.xlsx) calculation reports and DXF drawings without the trial watermark, listing the inputs, the equations used and the results; in trial mode the step-by-step detail is hidden. For this calculator alone, licensed users can also sign in on the calculator above and formally export a single-tool Word report (with a verification code) and DXF drawing. The Pro plan (all modules) is US$990 per year; see Pricing for monthly, perpetual and team plans.
2. Cross-module reconciliation: desktop project runs carry the design peak flow into downstream channel, culvert and bridge hydraulics; terrain cut/fill into the earthwork balance, cost and carbon tables; structural concrete, formwork and rebar take-off into the cost and carbon tables; slope and excavation safety-factor thresholds into construction monitoring trigger levels.
3. Agency plan reviewers and university faculty can request a complimentary review or teaching license (link below).
Standard example (calculation core defaults)
The worked example below was computed by the calculation core when this page was built; entering the same inputs above reproduces it. Verification cases, tolerances and actual differences for the calculation core are listed on the Benchmarks page.
The standard example uses the default inputs of the calculation core. Every number below was produced by the core when this page was built; nothing on this page is computed by hand.
Every number in this example was produced by the calculation core (WebAssembly) when this page was built. This calculator computes to the documents named in its basis line and works in SI units; use the unit button in the calculator to view US customary equivalents. Basis reported by the core: Taiwan Sewerage Engineering Facility Standards (amended 2025-11-04) Arts. 3-8; Manning flow and hydraulic grade line by the design-table method
1. Input Parameters
| Design Parameter | Value | Unit |
|---|---|---|
| Conduit Section | Circular pipe (RCP) | — |
| Pipe Inside Diameter D | 1 | m |
| Conduit Wall Thickness | 0.1 | m |
| Reinforced Concrete Pipe | Yes | — |
| Reach Length L | 40 | m |
| Ground Level at Upstream Manhole | 102.5 | m |
| Ground Level at Downstream Manhole | 102.1 | m |
| Upstream Invert Level | 100.32 | m |
| Downstream Invert Level | 100 | m |
| Design Discharge Q | 1.2 | cms |
| Manning Roughness n | 0.013 | — |
| Head Loss Coefficient at Upstream Manhole K | 0.5 | — |
| Downstream Receiving Water Level | (blank) | m |
| Check vertical clearance to a crossing utility | Yes | — |
| Station of Crossing Utility | 20 | m |
| Crossing Utility Top Level (outside) | 101.95 | m |
| Crossing Utility Bottom Level (outside) | 101.65 | m |
| Required Minimum Vertical Clearance | 0.3 | m |
2. Computed Results (calculation core output)
| Output | Result |
|---|---|
| Design velocity V | 2.81 m/s |
| Design depth | 0.53 m |
| Full-flow capacity Qf | 2.144 m³/s |
| Upstream manhole HGL | 101.06 m |
| Upstream manhole freeboard (ground − HGL) | 1.44 m |
| Minimum cover over crown | 1.00 m |
| Vertical clearance to crossing utility | 0.39 m |
Verification Checks (calculation core output)
| Verification Item | Computed Result | Governing Limit / Criterion | Status | Basis |
|---|---|---|---|---|
| MH1→MH2 minimum design velocity | 2.81 m/s | ≥ 0.80 m/s | PASS | Taiwan Sewerage Engineering Facility Standards (amended 2025-11-04) Art. 3, item 3 |
| MH1→MH2 maximum design velocity | 2.81 m/s | ≤ 3.00 m/s | PASS | Taiwan Sewerage Engineering Facility Standards (amended 2025-11-04) Art. 3, item 3 |
| MH1→MH2 capacity (full-flow discharge ≥ design discharge) | 2.14 m³/s | ≥ 1.20 m³/s | PASS | Taiwan Sewerage Engineering Facility Standards (amended 2025-11-04) Art. 3 (Manning equation) |
| MH1→MH2 minimum pipe diameter | 1.00 m | ≥ 0.80 m | PASS | Taiwan Sewerage Engineering Facility Standards (amended 2025-11-04) Art. 4 |
| MH1→MH2 minimum cover depth | 1.00 m | ≥ 0.50 m | PASS | Taiwan Sewerage Engineering Facility Standards (amended 2025-11-04) Art. 5, item 2 (reinforced concrete pipe 50 cm; strengthen if less) |
| MH1→MH2 manhole spacing | 40.00 m | ≤ 150.00 m | PASS | Taiwan Sewerage Engineering Facility Standards (amended 2025-11-04) Art. 8, item 2 |
| Manhole MH1 hydraulic grade line not above ground level | 101.06 m | ≤ 102.50 m | PASS | A hydraulic grade line above ground level means surcharge at the manhole |
| Manhole MH2 hydraulic grade line not above ground level | 100.53 m | ≤ 102.10 m | PASS | A hydraulic grade line above ground level means surcharge at the manhole |
| Existing utility U1 vertical clearance | 0.39 m | ≥ 0.30 m | PASS | The required clearance is an input (per the rules of the utility authority) |
3. Calculation Steps (calculation core output, SI units)
[HyGeoWorks online preview - not for PE sealing or submittal] Slope S = 0.0080; full-flow capacity Qf = 2.144 m³/s; design depth 0.53 m, velocity V = 2.81 m/s Upstream manhole HGL 101.06 m, ground level 102.50 m → freeboard 1.44 m; cover over crown: upstream 1.08 m, downstream 1.00 m
Hydraulic grade line at manholes (2 rows)
| Manhole | Station (m) | Ground level (m) | HGL (m) | Freeboard (m) |
|---|---|---|---|---|
| MH1 | 0.0 | 102.50 | 101.06 | 1.44 |
| MH2 | 40.0 | 102.10 | 100.53 | 1.57 |
Assumptions and Limits Stated by the Calculation Core
- No downstream boundary water level given: the normal-depth level of the last reach is used (free outfall); enter the receiving water level when it is higher, to reflect backwater
- The minimum clearance to existing utilities is an input: Taiwan Sewerage Engineering Facility Standards (amended 2025-11-04) Art. 5 only requires prior joint survey and coordination with the relevant authorities when a sewer crosses existing public facilities and sets no numerical value; no clearance rule is built in
- The hydraulic grade line uses the design-table method (normal depth for free-surface reaches, full-pipe friction loss for pressurized reaches) without gradually varied flow computation; the design discharge of each reach is an input
Frequently Asked Questions
Common questions about this calculator and its basis are answered below. Final submittals require review and seal by a licensed Professional Engineer.
Which design basis does this calculator apply?
Taiwan Sewerage Engineering Facility Standards (amended 2025-11-04) Arts. 3-8; Manning flow and hydraulic grade line by the design-table method. Velocity, size, cover and manhole-spacing limits are those of the Taiwan sewer standard named in the basis line; check the requirements of your own authority separately.
What assumptions and limits does the calculation core state for this tool?
No downstream boundary water level given: the normal-depth level of the last reach is used (free outfall); enter the receiving water level when it is higher, to reflect backwater. The minimum clearance to existing utilities is an input: Taiwan Sewerage Engineering Facility Standards (amended 2025-11-04) Art. 5 only requires prior joint survey and coordination with the relevant authorities when a sewer crosses existing public facilities and sets no numerical value; no clearance rule is built in. The hydraulic grade line uses the design-table method (normal depth for free-surface reaches, full-pipe friction loss for pressurized reaches) without gradually varied flow computation; the design discharge of each reach is an input.
Where is the calculation performed, and can the result be sealed or submitted?
The calculation runs in your browser, in the same WebAssembly calculation core this page loads. The result is an online preview: its first line reads "[HyGeoWorks online preview - not for PE sealing or submittal]".
Can I recalculate without a network connection?
Yes. "Download the offline workbench" on this page saves one HTML file that contains the workbench and the same calculation core; opened from disk it recalculates without a network connection.
From the Online Preview to the HydroStudio Desktop Edition: Reports Without the Trial Watermark
The free online preview is not for PE sealing or submittal and has no Word report, DXF drawing or verification code. Licensed users can sign in on the calculator and formally export a single-tool Word report (with a verification code) and DXF drawing. Several calculators can be combined in the Project List and exported online as a multi-chapter project report, and projects with terrain or GIS files can run in the heavy cloud computation. For interactive 2D models and large simulations, the HydroStudio desktop edition (Windows 10/11, 64-bit) opens the exported .toml project and, with a license, writes report.docx, a report.xlsx with live formulas and DXF drawings without the trial watermark. Sealing and submittal remain the responsibility of the licensed engineer.
Compare all plans, including 90-day passes and perpetual licenses