Rectangular Drop Structure & Stilling Basin Calculator (Taiwan SWC Handbook §2.20)
Designs straight vertical drop structures and their stilling basins with US customary inputs (cfs, ft). The calculation core applies the Taiwan Soil and Water Conservation Handbook (2017) §2.20 Drop Structures — critical depth, basin length, end and longitudinal sills, baffle sill position, wingwall widths and RC slab thickness — and checks the drop height against the handbook limit.
Standards and references (context for this calculation; the basis the calculator applies is the one stated below):
Design basis as reported by the calculation core: Taiwan Soil and Water Conservation Handbook (2017) §2.20 Drop Structures (apron and stilling basin length, sills, wingwalls, RC thickness)
Recalculates in your browser as you edit inputs; Free sample Word report and DXF for this calculator; With a license: formal Word and DXF export, plus online project reports from the Project List.
Check Summary Preview (Software Format; Auto-Populated)
| Check item | Trial value | Status |
|---|---|---|
| Drop height | 1.83 m ≤ 3 m (higher drops require a project-specific design) | OK |
Summary of the online calculation (software format) for checking by the designer and an independent checker. Final submittals require review and seal by the licensed Professional Engineer in responsible charge.
Desktop edition: calculation reports and cross-module quantity reconciliation
1. Calculation reports: with a license, the desktop edition writes Word (.docx) and Excel (.xlsx) calculation reports and DXF drawings without the trial watermark, listing the inputs, the equations used and the results; in trial mode the step-by-step detail is hidden. For this calculator alone, licensed users can also sign in on the calculator above and formally export a single-tool Word report (with a verification code) and DXF drawing. The Pro plan (all modules) is US$990 per year; see Pricing for monthly, perpetual and team plans.
2. Cross-module reconciliation: desktop project runs carry the design peak flow into downstream channel, culvert and bridge hydraulics; terrain cut/fill into the earthwork balance, cost and carbon tables; structural concrete, formwork and rebar take-off into the cost and carbon tables; slope and excavation safety-factor thresholds into construction monitoring trigger levels.
3. Agency plan reviewers and university faculty can request a complimentary review or teaching license (link below).
Governing Equations (US Customary Notation) & Basis Reported by the Calculation Core
The equations and limits the calculation core applies are listed below for independent checking.
Worked Example: 6.0-ft Vertical Concrete Drop Structure at Q = 50 cfs
The worked example below was computed by the calculation core when this page was built; entering the same inputs above reproduces it. Verification cases, tolerances and actual differences for the calculation core are listed on the Benchmarks page.
Determine the critical depth d_c, stilling basin length L, end sill height H', longitudinal sill height, baffle sill position, wingwall widths and minimum RC slab thickness for a 5.0-ft-wide rectangular drop with H = 6.0 ft, 2.0-ft approach and tailwater depths and 6.0-ft channel top widths.
Every number in this example was produced by the calculation core (WebAssembly) when this page was built. The calculation core works in SI units: the US customary inputs below are converted with exact NIST SP 811 factors before the calculation, and results are shown in US customary units with the core's SI value in parentheses. Check values, criteria and calculation steps are the core's own SI output. Basis reported by the core: Taiwan Soil and Water Conservation Handbook (2017) §2.20 Drop Structures (apron and stilling basin length, sills, wingwalls, RC thickness)
1. Input Parameters
| Design Parameter | US Customary Value | Unit |
|---|---|---|
| Drop Structure Type | Stilling Basin Drop (with End & Longitudinal Sills) | — |
| Design Discharge Q | 50 | cfs |
| Drop Notch Width b | 5 | ft |
| Vertical Drop Height H | 6 | ft |
| Upstream Approach Depth h_1 | 2 | ft |
| Downstream Tailwater Depth h_2 | 2 | ft |
| Upstream Channel Top Width W_u | 6 | ft |
| Downstream Channel Top Width W_d | 6 | ft |
| Brick Masonry | No | — |
| Apron / Stilling Basin Length Provided | (blank) | ft |
2. Computed Results (calculation core output)
| Output | Result |
|---|---|
| Critical Depth dc | 1.46 ft (0.4449 m) |
| Stilling Basin Length L | 8.22 ft (2.506 m) |
| Minimum Terrain-Constrained Length 0.8L | 6.576 ft (2.004 m) |
| End Sill Height H' | 0.7298 ft (0.222 m) |
| Longitudinal Sill Height | 0.5474 ft (0.167 m) |
| Baffle Sill Distance X | 2.326 ft (0.709 m) |
| Upstream Wingwall Width B | 3.281 ft (1.000 m) |
| Downstream Wingwall Width A | 3.281 ft (1.000 m) |
| Min. RC Slab Thickness | 5.906 in (15 cm) |
| Max. Rebar Spacing | 9.843 in (25 cm) |
Verification Checks (calculation core output)
| Verification Item | Computed Result | Governing Limit / Criterion | Status | Basis |
|---|---|---|---|---|
| Drop height | 1.83 m | ≤ 3 m (higher drops require a project-specific design) | PASS | Taiwan Soil and Water Conservation Handbook (2017) §2.20 Drop Structures |
3. Calculation Steps (calculation core output, SI units)
[HyGeoWorks online preview - not for PE sealing or submittal] dc = (Q²/(b²·g))^(1/3) = (1.41584²/(1.524²×9.8))^(1/3) = 0.4449 m Stilling basin length L = √(H·dc)·(2.5 + 1.1·dc/H + 0.7·(dc/H)³) = √(1.8288×0.4449)×(2.5 + 1.1×0.2433 + 0.7×0.2433³) = 2.506 m End sill height H' = dc/2 = 0.222 m; longitudinal sill height = ¾H' = 0.167 m Cx (Wd/b = 1.200 interpolated) = 0.1700; baffle sill position X = Cx·b + 0.45 = 0.709 m Min. length 0.8L = 2.004 m (where terrain-constrained) Upstream wingwall B = (Wu − b)/2 + h1 + 0.2 = 0.962 m; Downstream wingwall A = (Wd − b − 0.4)/2 + h + 0.2 = 0.762 m (each >= 1 m) RC slab: thickness >= 15 cm, D13@25 cm (H ≤ 2 m)
US customary equivalents (NIST SP 811 conversion of the SI values reported by the core above; the core summary itself is unchanged) Critical Depth dc = 1.46 ft Stilling Basin Length L = 8.22 ft Minimum Terrain-Constrained Length 0.8L = 6.576 ft End Sill Height H' = 0.7298 ft Longitudinal Sill Height = 0.5474 ft Baffle Sill Distance X = 2.326 ft Upstream Wingwall Width B = 3.281 ft Downstream Wingwall Width A = 3.281 ft Min. RC Slab Thickness = 5.906 in Max. Rebar Spacing = 9.843 in
Assumptions and Limits Stated by the Calculation Core
- Stilling basin length taken as the computed value L = 2.51 m (where constrained by terrain it may be shortened to 2.00 m)
- Upstream wingwall B by formula = 0.96 m, less than 1 m; 1 m is used
- Downstream wingwall A by formula = 0.76 m, less than 1 m; 1 m is used
Frequently Asked Questions (Basis, Scope & Limits)
Common questions about this calculator and its basis are answered below. Final submittals require review and seal by a licensed Professional Engineer.
Why is ventilation beneath the nappe of a vertical free-overfall drop important?
If the air pocket beneath the falling jet is sealed by the sidewalls, sub-atmospheric pressure draws the jet toward the drop wall, which can cause nappe oscillation and vibration and change the jet impact point assumed in the basin layout. Provide ventilation where the sidewalls enclose the nappe.
What is the maximum drop height covered by this calculator?
The calculation core checks the drop height against 3 m (9.84 ft) per the Taiwan Soil and Water Conservation Handbook (2017) §2.20; higher drops require a project-specific design (for example a series of lower drops or a chute with a stilling basin).
Should weep holes or underdrains be provided beneath the stilling basin slab?
Uplift beneath the slab is commonly relieved with weep holes or underdrains protected by graded filter material or geotextile so that foundation fines are not washed out. The calculator gives the minimum slab thickness and bar spacing of the handbook only; drainage and uplift checks are separate.
Does the HydroStudio desktop edition also design chutes and USBR stilling basins?
Yes. The HydroStudio desktop edition includes a chute and stilling basin module that sizes USBR Type II, Type III, Type IV and SAF basins following USBR Engineering Monograph No. 25 and FHWA HEC-14, alongside the Taiwan Soil and Water Conservation Handbook chute provisions.
From the Online Preview to the HydroStudio Desktop Edition: Reports Without the Trial Watermark
The free online preview is not for PE sealing or submittal and has no Word report, DXF drawing or verification code. Licensed users can sign in on the calculator and formally export a single-tool Word report (with a verification code) and DXF drawing. Several calculators can be combined in the Project List and exported online as a multi-chapter project report, and projects with terrain or GIS files can run in the heavy cloud computation. For interactive 2D models and large simulations, the HydroStudio desktop edition (Windows 10/11, 64-bit) opens the exported .toml project and, with a license, writes report.docx, a report.xlsx with live formulas and DXF drawings without the trial watermark. Sealing and submittal remain the responsibility of the licensed engineer.
Compare all plans, including 90-day passes and perpetual licenses