HyGeoWorks
🔒 Previews run in your browser (WebAssembly) · Inputs are sent only when you formally export
Rational Method & Triangular Hydrograph · User-Entered IDF Intensities · Cu Ft & Ac-Ft

Preliminary Stormwater Detention Volume Calculator (Rational Method & Triangular Hydrograph)

Preliminary detention sizing with US customary inputs (acres, in./hr, cfs, cu ft). The calculation core computes the pre-development allowable release Q_pre and the post-development peak Q_post by the Rational Method, the triangular-hydrograph storage Vs from the base time T_b = 2.67(√T_c + 0.6·T_c) (a Taiwan soil and water conservation practice formula, not the NRCS unit hydrograph form), and a design storage of 1.1·Vs. Rainfall intensities are inputs; no rainfall dataset is built in.

Standards and references (context for this calculation; the basis the calculator applies is the one stated below):

Design basis for this page ▾
Rational Method & Triangular Hydrograph On-Site Detention Sizing (Custom IDF) — triangular hydrograph base time T_b = 2.67(√T_c + 0.6·T_c) (Taiwan SWC practice formula)

Design basis as reported by the calculation core: Rational Method & Triangular Hydrograph On-Site Detention Sizing (Custom IDF)

Recalculates in your browser as you edit inputs; Free sample Word report and DXF for this calculator; With a license: formal Word and DXF export, plus online project reports from the Project List; 3D schematic: fixed example, not drawn from your inputs.

Interactive US Customary Engineering Workstation
US customary inputs, shown as US (SI) in the results
Free Samples and Pricing
A public sample produced by the production service from this page's standard example and sealed with a verification code: open it in Word or AutoCAD and check it on the Verify page. Not for PE sealing or submittal.
Single-export pass: US$19 for one calculator, 3 formal exports in total within 24 hours of the first; full credit toward an upgrade within 30 days, full refund before the first export
Single-export passes (one calculator, 3 exports within 24 hours), 30-day passes, annual plans and perpetual licenses; printable quotes for purchase orders.
Formal export and the Project List are on the workbench toolbar above:
Licensed users can formally export this calculator's Word report (with a verification code and server time witness) and AutoCAD DXF drawing, or add several calculators to the free Project List and export a multi-chapter project report online, with nothing to install on a Mac. Projects with DEM terrain or GIS files can run in the heavy cloud computation or in the HydroStudio desktop edition.
The summary lists the basis, key results and check verdicts; its first line marks it as an online preview, not for PE sealing or submittal.
Download the Offline Workbench (Single HTML File, 39 Tools)
No install and no email required. It contains the same calculation core as this site; results are also a preview, not for sealed submittals.

Check Summary Preview (Software Format; Auto-Populated)

Stormwater Detention Basin Sizing Calculator (Rational Method & Triangular Hydrograph): check summary (software format)
Calculation basis: Rational Method & Triangular Hydrograph On-Site Detention Sizing (Custom IDF)
Check item Trial value Status
Pre-Development Peak Flow Q10.4197 cmsCalculated value
Post-Development Peak Flow Q31.6989 cmsCalculated value
Required Detention Volume Vs3124.5 m³Calculated value
Design Storage Capacity (1.1×Vs)3437.0 m³Calculated value

Summary of the online calculation (software format) for checking by the designer and an independent checker. Final submittals require review and seal by the licensed Professional Engineer in responsible charge.

Desktop edition: calculation reports and cross-module quantity reconciliation

1. Calculation reports: with a license, the desktop edition writes Word (.docx) and Excel (.xlsx) calculation reports and DXF drawings without the trial watermark, listing the inputs, the equations used and the results; in trial mode the step-by-step detail is hidden. For this calculator alone, licensed users can also sign in on the calculator above and formally export a single-tool Word report (with a verification code) and DXF drawing. The Pro plan (all modules) is US$990 per year; see Pricing for monthly, perpetual and team plans.
2. Cross-module reconciliation: desktop project runs carry the design peak flow into downstream channel, culvert and bridge hydraulics; terrain cut/fill into the earthwork balance, cost and carbon tables; structural concrete, formwork and rebar take-off into the cost and carbon tables; slope and excavation safety-factor thresholds into construction monitoring trigger levels.
3. Agency plan reviewers and university faculty can request a complimentary review or teaching license (link below).

Desktop pricing (Pro US$990/yr) Download the desktop trial Complimentary license for agency reviewers and faculty
Scope and responsibility: This page is a single-calculator trial run; cross-module quantity reconciliation is done in desktop project runs. Problems outside this calculator's scope (see the FAQ) need an appropriate analysis method. Final submittals require review and seal by a licensed Professional Engineer.

Governing Equations (US Customary Notation) & Basis Reported by the Calculation Core

The equations and limits the calculation core applies are listed below for independent checking.

Rational Method Peak Flows (US Customary Form)
Q_pre = 1.0083 · C_pre · i_pre · A [cfs], Q_post = 1.0083 · C_post · i_post · A [cfs]
A = drainage area (acres); i = rainfall intensity for a duration equal to T_c (in./hr); 1 ac·in./hr = 1.00833 cfs. The core evaluates the SI form Q = C·I·A / 360 (I in mm/h, A in ha).
Triangular Hydrograph Detention Storage
T_b = 2.67 · (√T_c + 0.6 · T_c) [h, min. 1.0 h], V_s = 0.5 · (Q_post − Q_pre) · T_b · 3600 [cu ft], V_design = 1.1 · V_s
T_c in hours (post-development); 1 ac-ft = 43,560 cu ft. The worked example lists Vs and the design storage computed by the core.

Worked Example: 10.0-Acre Commercial Development Detention Volume (100-yr Inflow vs. 25-yr Release)

The worked example below was computed by the calculation core when this page was built; entering the same inputs above reproduces it. Verification cases, tolerances and actual differences for the calculation core are listed on the Benchmarks page.

Size the preliminary detention volume for a 10.0-acre site changing from meadow (C = 0.35, T_c = 25 min, i_25 = 4.20 in./hr) to paved commercial use (C = 0.85, T_c = 10 min, i_100 = 7.00 in./hr).

Every number in this example was produced by the calculation core (WebAssembly) when this page was built. The calculation core works in SI units: the US customary inputs below are converted with exact NIST SP 811 factors before the calculation, and results are shown in US customary units with the core's SI value in parentheses. Check values, criteria and calculation steps are the core's own SI output. Basis reported by the core: Rational Method & Triangular Hydrograph On-Site Detention Sizing (Custom IDF)

1. Input Parameters

Design ParameterUS Customary ValueUnit
Drainage Catchment Area A10ac
Pre-Development Runoff Coeff. C_pre0.35—
Post-Development Runoff Coeff. C_post0.85—
Pre-Development T_c,pre25min
Post-Development T_c,post10min
Inflow Return Period100—
Outflow Return Period25—
Hydrograph Time BaseTaiwan SWC practice formula Tb = 2.67(√Tc + 0.6Tc)—
Provided Pond Storage Volume(blank)ft³

2. Computed Results (calculation core output)

OutputResult
Pre-Development Peak Flow Q114.82 cfs (0.4197 cms)
Post-Development Peak Flow Q360 cfs (1.6989 cms)
Required Detention Volume Vs110300 ft³ (3124.5 m³)
Design Storage Capacity (1.1×Vs)121400 ft³ (3437.0 m³)
Allowable Release Rate Q_allow14.82 cfs (0.4197 cms)

3. Calculation Steps (calculation core output, SI units)

[HyGeoWorks online preview - not for PE sealing or submittal]
Custom IDF Rainfall Intensity: Pre-development I(25-yr, 25 min) = 106.68 mm/h; Post-development I(100-yr, 10 min) = 177.80 mm/h
Rational Formula Q = C·I·A / 360: Q1 = 0.35×106.68×4.04686/360 = 0.4197 cms; Q3 = 0.85×177.80×4.04686/360 = 1.6989 cms
Triangular hydrograph base time, Taiwan SWC practice form (SCS factor 2.67 with Tp = √Tc + 0.6Tc, not the NRCS Tp = ΔD/2 + 0.6Tc) Tb = 2.67(√Tc + 0.6Tc): Tb = 1.357 h (min. 1.0 h); Vs2 = Tb·(Q3 − Q1)/2 × 3600 = 3124.5 m³; design storage (Taiwan SWC Technical Regulations Art. 96) 1.1·Vs2 = 3437.0 m³
US customary equivalents (NIST SP 811 conversion of the SI values reported by the core above; the core summary itself is unchanged)
  Pre-Development Peak Flow Q1 = 14.82 cfs
  Post-Development Peak Flow Q3 = 60 cfs
  Required Detention Volume Vs = 110300 ft³
  Design Storage Capacity (1.1×Vs) = 121400 ft³
  Allowable Release Rate Q_allow = 14.82 cfs

Frequently Asked Questions (Basis, Scope & Limits)

Common questions about this calculator and its basis are answered below. Final submittals require review and seal by a licensed Professional Engineer.

When is Rational Method triangular-hydrograph sizing appropriate?

It is a preliminary method for small sites, useful for reserving pond or vault area before detailed hydrograph routing. Whether it is accepted for design, and up to what drainage area, is set by the reviewing municipality or agency; check its criteria before relying on the result.

Where do the rainfall intensities come from?

They are inputs: read the intensity (in./hr) for your project location, return period and T_c duration from the IDF source your agency requires — for example the NOAA Atlas 14 Precipitation Frequency Data Server (hdsc.nws.noaa.gov) — and enter them as i_pre and i_post.

Does the HydroStudio desktop edition include NRCS 24-hour design storms and pond routing?

Yes. The HydroStudio desktop edition holds the SCS (NRCS) 24-hour dimensionless cumulative storm distributions Types I, IA, II and III (as tabulated in FHWA HDS-2, Table 6.5) and level-pool routing through orifice and weir outlets with a varying downstream water level.

Why is the design storage 1.1 times the triangular-hydrograph volume?

The calculation core reports a design storage of 1.1·Vs (a 10% allowance). In the core's regulation library this factor is the one the Taiwan Soil and Water Conservation Technical Regulations Art. 96 sets for permanent detention facilities; apply the storage allowance your agency requires.

USD Pricing · Checkout by Stripe · Printable USD Quotation

From the Online Preview to the HydroStudio Desktop Edition: Reports Without the Trial Watermark

The free online preview is not for PE sealing or submittal and has no Word report, DXF drawing or verification code. Licensed users can sign in on the calculator and formally export a single-tool Word report (with a verification code) and DXF drawing. Several calculators can be combined in the Project List and exported online as a multi-chapter project report, and projects with terrain or GIS files can run in the heavy cloud computation. For interactive 2D models and large simulations, the HydroStudio desktop edition (Windows 10/11, 64-bit) opens the exported .toml project and, with a license, writes report.docx, a report.xlsx with live formulas and DXF drawings without the trial watermark. Sealing and submittal remain the responsibility of the licensed engineer.

Monthly
Pro monthly
$119 / month
One discipline: $69 / month. Renews monthly until canceled; cancel any time before the next renewal and keep using it to the end of the paid month.
Buy monthly ($119/mo)
30 days
30-day pass
$79 / 30 days, one discipline
All modules: $135. One payment; it does not renew. The pass fee can be credited once toward an annual or perpetual license of the same discipline or a higher plan bought within 30 days after the pass ends, with the same email and in the same currency.
Buy a 30-day pass (from $79)
Quotation
Printable USD quotation
For any plan, including Firm (from 3 seats) and Enterprise (from 10 seats), which are sold only to businesses and other organizations, not to individual buyers: print the quotation or save it as a PDF for your purchasing process.
Request a printable USD quotation

Compare all plans, including 90-day passes and perpetual licenses

Checkout is processed by Stripe; a tax ID can be entered at checkout, and for one-time payments Stripe issues an invoice showing the buyer's name and tax ID. Procurement follows your organization's own rules.

Explore All 31 Tools (20 US Customary + 11 Reference: Basis Stated on Each Page)

Need to edit terrain, 2D flood models and design alternatives interactively on your computer, or see 3D views drawn from your project data? Use the HydroStudio desktop edition:
Download the Desktop Trial
No credit card or phone number is needed to download. Without a license it runs as a trial: local calculation and 3D viewing work, exported reports and drawings carry a trial watermark (not for submittal), and some built-in data libraries are limited. Plans and prices are on the Pricing page.