Preliminary Stormwater Detention Volume Calculator (Rational Method & Triangular Hydrograph)
Preliminary detention sizing with US customary inputs (acres, in./hr, cfs, cu ft). The calculation core computes the pre-development allowable release Q_pre and the post-development peak Q_post by the Rational Method, the triangular-hydrograph storage Vs from the base time T_b = 2.67(√T_c + 0.6·T_c) (a Taiwan soil and water conservation practice formula, not the NRCS unit hydrograph form), and a design storage of 1.1·Vs. Rainfall intensities are inputs; no rainfall dataset is built in.
Standards and references (context for this calculation; the basis the calculator applies is the one stated below):
Design basis as reported by the calculation core: Rational Method & Triangular Hydrograph On-Site Detention Sizing (Custom IDF)
Recalculates in your browser as you edit inputs; Free sample Word report and DXF for this calculator; With a license: formal Word and DXF export, plus online project reports from the Project List; 3D schematic: fixed example, not drawn from your inputs.
Check Summary Preview (Software Format; Auto-Populated)
| Check item | Trial value | Status |
|---|---|---|
| Pre-Development Peak Flow Q1 | 0.4197 cms | Calculated value |
| Post-Development Peak Flow Q3 | 1.6989 cms | Calculated value |
| Required Detention Volume Vs | 3124.5 m³ | Calculated value |
| Design Storage Capacity (1.1×Vs) | 3437.0 m³ | Calculated value |
Summary of the online calculation (software format) for checking by the designer and an independent checker. Final submittals require review and seal by the licensed Professional Engineer in responsible charge.
Desktop edition: calculation reports and cross-module quantity reconciliation
1. Calculation reports: with a license, the desktop edition writes Word (.docx) and Excel (.xlsx) calculation reports and DXF drawings without the trial watermark, listing the inputs, the equations used and the results; in trial mode the step-by-step detail is hidden. For this calculator alone, licensed users can also sign in on the calculator above and formally export a single-tool Word report (with a verification code) and DXF drawing. The Pro plan (all modules) is US$990 per year; see Pricing for monthly, perpetual and team plans.
2. Cross-module reconciliation: desktop project runs carry the design peak flow into downstream channel, culvert and bridge hydraulics; terrain cut/fill into the earthwork balance, cost and carbon tables; structural concrete, formwork and rebar take-off into the cost and carbon tables; slope and excavation safety-factor thresholds into construction monitoring trigger levels.
3. Agency plan reviewers and university faculty can request a complimentary review or teaching license (link below).
Governing Equations (US Customary Notation) & Basis Reported by the Calculation Core
The equations and limits the calculation core applies are listed below for independent checking.
Worked Example: 10.0-Acre Commercial Development Detention Volume (100-yr Inflow vs. 25-yr Release)
The worked example below was computed by the calculation core when this page was built; entering the same inputs above reproduces it. Verification cases, tolerances and actual differences for the calculation core are listed on the Benchmarks page.
Size the preliminary detention volume for a 10.0-acre site changing from meadow (C = 0.35, T_c = 25 min, i_25 = 4.20 in./hr) to paved commercial use (C = 0.85, T_c = 10 min, i_100 = 7.00 in./hr).
Every number in this example was produced by the calculation core (WebAssembly) when this page was built. The calculation core works in SI units: the US customary inputs below are converted with exact NIST SP 811 factors before the calculation, and results are shown in US customary units with the core's SI value in parentheses. Check values, criteria and calculation steps are the core's own SI output. Basis reported by the core: Rational Method & Triangular Hydrograph On-Site Detention Sizing (Custom IDF)
1. Input Parameters
| Design Parameter | US Customary Value | Unit |
|---|---|---|
| Drainage Catchment Area A | 10 | ac |
| Pre-Development Runoff Coeff. C_pre | 0.35 | — |
| Post-Development Runoff Coeff. C_post | 0.85 | — |
| Pre-Development T_c,pre | 25 | min |
| Post-Development T_c,post | 10 | min |
| Inflow Return Period | 100 | — |
| Outflow Return Period | 25 | — |
| Hydrograph Time Base | Taiwan SWC practice formula Tb = 2.67(√Tc + 0.6Tc) | — |
| Provided Pond Storage Volume | (blank) | ft³ |
2. Computed Results (calculation core output)
| Output | Result |
|---|---|
| Pre-Development Peak Flow Q1 | 14.82 cfs (0.4197 cms) |
| Post-Development Peak Flow Q3 | 60 cfs (1.6989 cms) |
| Required Detention Volume Vs | 110300 ft³ (3124.5 m³) |
| Design Storage Capacity (1.1×Vs) | 121400 ft³ (3437.0 m³) |
| Allowable Release Rate Q_allow | 14.82 cfs (0.4197 cms) |
3. Calculation Steps (calculation core output, SI units)
[HyGeoWorks online preview - not for PE sealing or submittal] Custom IDF Rainfall Intensity: Pre-development I(25-yr, 25 min) = 106.68 mm/h; Post-development I(100-yr, 10 min) = 177.80 mm/h Rational Formula Q = C·I·A / 360: Q1 = 0.35×106.68×4.04686/360 = 0.4197 cms; Q3 = 0.85×177.80×4.04686/360 = 1.6989 cms Triangular hydrograph base time, Taiwan SWC practice form (SCS factor 2.67 with Tp = √Tc + 0.6Tc, not the NRCS Tp = ΔD/2 + 0.6Tc) Tb = 2.67(√Tc + 0.6Tc): Tb = 1.357 h (min. 1.0 h); Vs2 = Tb·(Q3 − Q1)/2 × 3600 = 3124.5 m³; design storage (Taiwan SWC Technical Regulations Art. 96) 1.1·Vs2 = 3437.0 m³
US customary equivalents (NIST SP 811 conversion of the SI values reported by the core above; the core summary itself is unchanged) Pre-Development Peak Flow Q1 = 14.82 cfs Post-Development Peak Flow Q3 = 60 cfs Required Detention Volume Vs = 110300 ft³ Design Storage Capacity (1.1×Vs) = 121400 ft³ Allowable Release Rate Q_allow = 14.82 cfs
Frequently Asked Questions (Basis, Scope & Limits)
Common questions about this calculator and its basis are answered below. Final submittals require review and seal by a licensed Professional Engineer.
When is Rational Method triangular-hydrograph sizing appropriate?
It is a preliminary method for small sites, useful for reserving pond or vault area before detailed hydrograph routing. Whether it is accepted for design, and up to what drainage area, is set by the reviewing municipality or agency; check its criteria before relying on the result.
Where do the rainfall intensities come from?
They are inputs: read the intensity (in./hr) for your project location, return period and T_c duration from the IDF source your agency requires — for example the NOAA Atlas 14 Precipitation Frequency Data Server (hdsc.nws.noaa.gov) — and enter them as i_pre and i_post.
Does the HydroStudio desktop edition include NRCS 24-hour design storms and pond routing?
Yes. The HydroStudio desktop edition holds the SCS (NRCS) 24-hour dimensionless cumulative storm distributions Types I, IA, II and III (as tabulated in FHWA HDS-2, Table 6.5) and level-pool routing through orifice and weir outlets with a varying downstream water level.
Why is the design storage 1.1 times the triangular-hydrograph volume?
The calculation core reports a design storage of 1.1·Vs (a 10% allowance). In the core's regulation library this factor is the one the Taiwan Soil and Water Conservation Technical Regulations Art. 96 sets for permanent detention facilities; apply the storage allowance your agency requires.
From the Online Preview to the HydroStudio Desktop Edition: Reports Without the Trial Watermark
The free online preview is not for PE sealing or submittal and has no Word report, DXF drawing or verification code. Licensed users can sign in on the calculator and formally export a single-tool Word report (with a verification code) and DXF drawing. Several calculators can be combined in the Project List and exported online as a multi-chapter project report, and projects with terrain or GIS files can run in the heavy cloud computation. For interactive 2D models and large simulations, the HydroStudio desktop edition (Windows 10/11, 64-bit) opens the exported .toml project and, with a license, writes report.docx, a report.xlsx with live formulas and DXF drawings without the trial watermark. Sealing and submittal remain the responsibility of the licensed engineer.
Compare all plans, including 90-day passes and perpetual licenses