| Check item | Trial value | Status |
|---|---|---|
| Provided Pond Storage Volume | 2000.0 ≥ 1461.0 | OK |
Summary of the online calculation (software format) for checking by the designer and an independent checker. Final sign-off remains the responsibility of the chartered or registered engineer.
Desktop edition: calculation reports and cross-module quantity reconciliation
1. Calculation reports: with a licence, the desktop edition writes Word (.docx) and Excel (.xlsx) calculation reports and DXF drawings without the trial watermark, listing the inputs, the equations used and the results; in trial mode the step-by-step detail is hidden. For this calculator alone, licensed users can also sign in on the calculator above and formally export a single-tool Word report (with a verification code) and DXF drawing. The Pro plan (all modules) is US$990 per year; see Pricing for monthly, perpetual and team plans.
2. Cross-module reconciliation: desktop project runs carry the design peak flow into downstream channel, culvert and bridge hydraulics; terrain cut/fill into the earthwork balance, cost and carbon tables; structural concrete, formwork and rebar take-off into the cost and carbon tables; slope and excavation safety-factor thresholds into construction monitoring trigger levels.
3. Independent checking engineers, authority reviewers and academics can request a complimentary review or teaching licence (link below).
1. Governing Equations & SI Nomenclature
The equations the calculation core applies are summarised below for independent checking.
The equations below summarise the method that the calculation core applies on this page. The design basis it reports is: Rational Method & Triangular Hydrograph On-Site Detention Sizing (Custom IDF). The worked example further down lists the core's own calculation steps for the standard example.
2. Worked Standard Example (Computed by the Calculation Core)
The worked example below was computed by the calculation core when this page was built; entering the same inputs above reproduces it.
Design Scenario — 3.0 ha Site: 100-Year Inflow, 10-Year Allowable Release: Size a detention pond for a 3.0 ha development where the runoff coefficient rises from 0.45 to 0.90 and the time of concentration falls from 20 min to 10 min, with design intensities of 85 mm/h (10-year, 20 min) before and 115 mm/h (100-year, 10 min) after development, and check a provided volume of 2,000 m³.
The inputs below were passed to the calculation core (WebAssembly) when this page was built; every step, result and check shown here is the core's own output. Basis reported by the core: Rational Method & Triangular Hydrograph On-Site Detention Sizing (Custom IDF)
Inputs Passed to the Calculation Core
| Parameter | Value | Unit |
|---|---|---|
| Catchment Area A | 3 | ha |
| Pre-development Runoff C1 | 0.45 | — |
| Post-development Runoff C2 | 0.9 | — |
| Pre-development Tc1 (min) | 20 | min |
| Post-development Tc2 (min) | 10 | min |
| Inflow Return Period | 100 | — |
| Outflow Return Period | 10 | — |
| Hydrograph Time Base | Taiwan SWC practice formula Tb = 2.67(√Tc + 0.6Tc) | — |
| Provided Pond Storage Volume | 2000 | m³ |
Calculation Steps (calculation core output)
[HyGeoWorks online preview - not for PE sealing or submittal]
- Custom IDF Rainfall Intensity: Pre-development I(10-yr, 20 min) = 85.00 mm/h; Post-development I(100-yr, 10 min) = 115.00 mm/h
- Rational Formula Q = C·I·A / 360: Q1 = 0.45×85.00×3/360 = 0.3187 cms; Q3 = 0.9×115.00×3/360 = 0.8625 cms
- Triangular hydrograph base time, Taiwan SWC practice form (SCS factor 2.67 with Tp = √Tc + 0.6Tc, not the NRCS Tp = ΔD/2 + 0.6Tc) Tb = 2.67(√Tc + 0.6Tc): Tb = 1.357 h (min. 1.0 h); Vs2 = Tb·(Q3 − Q1)/2 × 3600 = 1328.2 m³; design storage (Taiwan SWC Technical Regulations Art. 96) 1.1·Vs2 = 1461.0 m³
Computed Results (calculation core output)
| Output Parameter | Calculated Value | SI Unit |
|---|---|---|
| Pre-Development Peak Flow Q1 | 0.3187 | cms |
| Post-Development Peak Flow Q3 | 0.8625 | cms |
| Required Detention Volume Vs | 1328.2 | m³ |
| Design Storage Capacity (1.1×Vs) | 1461.0 | m³ |
| Allowable Release Rate Q_allow | 0.3187 | cms |
Verification Checks (calculation core output)
| Verification Check | Computed Value | Criterion | Verdict | Basis |
|---|---|---|---|---|
| Provided Pond Storage Volume | 2000.0 | ≥ 1461.0 | OK | Rational Method & Triangular Hydrograph On-Site Detention Sizing (Custom IDF) |
3. Regional Design Options in This Edition: UK, EU, Singapore, Malaysia, Hong Kong & Australia
Symbols and units are SI unless stated otherwise.
- This calculator: the design basis is the one reported by the calculation core: Rational Method & Triangular Hydrograph On-Site Detention Sizing (Custom IDF). The options listed below belong to the calculators named in each item.
- United Kingdom, Ireland & European Union: The retaining wall and slope stability calculators default to EN 1997-1:2004 Design Approach 1 (Combination 1 & Combination 2); the UK National Annex and 2nd-Gen EN 1997-1:2024 / EN 1997-3:2025 (MFA, and RFA for retaining walls) are selectable there, as are DA2 for retaining walls and DA3 for slopes. The retaining wall calculator lets γG, γQ and γφ' be overridden for a National Annex and designs metric H-bars (H10–H32) when concrete and steel strengths are entered.
- Singapore & Malaysia: The retaining wall calculator offers SS EN 1997-1:2010 with the Singapore National Annex, and the detention calculator offers a DID Malaysia MSMA 2nd Edition (2012) Equation 2.2 IDF rainfall mode besides directly entered design intensities.
- Hong Kong SAR: HyGeoWorks does not claim Hong Kong Buildings Department pre-accepted program status; the retaining wall calculator's HK GEO Geoguide 1 option shows the calculation core's steps and checks so that the result can be checked independently. With that option the calculation core applies the Geoguide 1 Table 6 and Table 7 partial factors at ULS and the §9.2.4 middle-third eccentricity check at SLS.
- Australia & New Zealand: No ARR 2019 IFD data is built in; design rainfall intensities for any AEP can be entered directly in the detention calculator. The HydroStudio desktop edition supports GDA2020 / MGA2020 zones 46–59 as well as WGS 84 / UTM zones.
4. Frequently Asked Questions
Common questions about this calculator are answered below. Final sign-off remains the responsibility of the chartered or registered engineer.
Where do the rainfall intensities come from?
In the default mode you enter the pre- and post-development design intensities directly, so values from any local IDF or IFD source can be used; no national IDF data set is built in for this mode. Alternatively, the DID Malaysia MSMA 2nd Edition (2012) Equation 2.2 IDF mode computes them from the station coefficients.
Why is a 10% allowance added to the storage?
The calculation core reports the design storage as 1.1 times the triangular-hydrograph volume Vs and checks the provided volume against it. The triangular hydrograph is a simplified estimate, and the allowance gives a margin over it.
When is a full routing analysis needed?
The triangular hydrograph gives a preliminary volume. For outlet design with storage–discharge behaviour, tailwater or several storm durations, use level-pool routing: the HydroStudio desktop edition routes design storms through ponds with time-varying tailwater, flap gates and multiple outlets, and exports EPA SWMM .inp files.
How do I size the outlet for the allowable release?
Take the allowable release Q1 reported on this page into the Orifice & Weir Sizing calculator (/en/tools/orifice-weir/), which rounds the orifice diameter or weir length down so the actual outflow does not exceed it.
5. Explore All 30 Calculators (SI Edition; Design Basis Stated on Each Page)
Each calculator below states its own design basis on its page; several apply Taiwan regulations and say so.