Check Summary Preview (Software Format; Auto-Populated)
| Check item | Trial value | Status |
|---|---|---|
| Pier backwater | 0.020 m | Calculated value |
| Flow area obstruction ratio | 5.0 % | Calculated value |
| Contraction scour depth | 0.00 m | Calculated value |
| Local pier scour depth (max) | 3.47 m | Calculated value |
Summary of the online calculation (software format) for checking by the designer and an independent checker. Final sign-off remains the responsibility of the chartered or registered engineer.
Desktop edition: calculation reports and cross-module quantity reconciliation
1. Calculation reports: with a licence, the desktop edition writes Word (.docx) and Excel (.xlsx) calculation reports and DXF drawings without the trial watermark, listing the inputs, the equations used and the results; in trial mode the step-by-step detail is hidden. For this calculator alone, licensed users can also sign in on the calculator above and formally export a single-tool Word report (with a verification code) and DXF drawing. The Pro plan (all modules) is US$990 per year; see Pricing for monthly, perpetual and team plans.
2. Cross-module reconciliation: desktop project runs carry the design peak flow into downstream channel, culvert and bridge hydraulics; terrain cut/fill into the earthwork balance, cost and carbon tables; structural concrete, formwork and rebar take-off into the cost and carbon tables; slope and excavation safety-factor thresholds into construction monitoring trigger levels.
3. Independent checking engineers, authority reviewers and academics can request a complimentary review or teaching licence (link below).
1. Worked Standard Example (Computed by the Calculation Core)
The worked example below was computed by the calculation core when this page was built; entering the same inputs above reproduces it.
Design Scenario — Standard example (calculation core defaults): The standard example uses the default inputs of the calculation core. Every number below was produced by the core when this page was built; nothing on this page is computed by hand.
The inputs below were passed to the calculation core (WebAssembly) when this page was built; every step, result and check shown here is the core's own output. Basis reported by the core: FHWA HEC-18 5th Ed. (2012) Eqs. 6.1–6.4, 7.1–7.4, 7.32, 7.34; HEC-RAS Hydraulic Reference Manual Eq. 5-4 (Yarnell); FHWA HEC-23 Design Guideline 11
Inputs Passed to the Calculation Core
| Parameter | Value | Unit |
|---|---|---|
| Design Discharge Q | 600 | cms |
| River Width at Bridge B | 80 | m |
| Flow Depth at Bridge y | 3.5 | m |
| Upstream Main Channel Width W1 | (blank) | m |
| Upstream Approach Depth y1 | (blank) | m |
| Flow Angle of Attack | 0 | ° |
| Pier Width a | 2 | m |
| Pier Length L | 8 | m |
| Pier Nose Shape | Round nose | — |
| Number of Piers in Channel | 2 | — |
| Yarnell Pier Type | From pier nose shape (conservative value where no unique match) | — |
| Pier Riprap Velocity Adjustment Factor K2 | (blank) | — |
| Minimum Pier Centre Spacing | (blank) | m |
| Woody Debris on Pier | Not considered | — |
| Bed Material D50 | 30 | mm |
| Bed Material D84 | (blank) | mm |
| Bed Condition | Plane bed and antidune flow 1.1 | — |
| Upstream Energy Slope S1 | (blank) | — |
| Fall Velocity of D50, T | (blank) | m/s |
| Long-Term Bed Degradation | 1 | m |
| Mobile Bed Layer Thickness | 0 | m |
| Low Chord Height | (blank) | m |
| River Class | Taiwan central / special-municipality rivers 1.5 m | — |
| Custom Minimum Low-Chord Clearance | (blank) | m |
| Flow Area Obstruction Ratio Limit | (blank) | % |
| Reach Freeboard Fb | (blank) | m |
| Pier Backwater Analysis | One-dimensional analysis (Yarnell backwater) | — |
| Foundation Embedment | (blank) | m |
| Falsework in Flood Season | No | — |
| Cumulative Falsework Width | (blank) | m |
| River Width | (blank) | m |
Calculation Steps (calculation core output)
[HyGeoWorks online preview - not for PE sealing or submittal]
- Velocity at bridge V = 2.14 m/s, Froude number Fr = 0.37, velocity head 0.234 m
- Total projected pier width 4.00 m; flow area obstruction ratio 5.0%; backwater 0.020 m (Yarnell); upstream depth after bridging 3.52 m
- Approach velocity V1 = 2.14 m/s, critical velocity Vc = 2.37 m/s → clear-water scour
- Contraction scour: live-bed y2 = 3.63 m (k1 = 0.69)→ 0.13 m; clear-water y2 = 3.09 m → 0.00 m; adopted 0.00 m
- Maximum probable scour depth = long-term 1.00 + mobile layer 0.00 + contraction 0.00 + local 3.47 = 4.47 m
Computed Results (calculation core output)
| Output Parameter | Calculated Value | SI Unit |
|---|---|---|
| Pier backwater | 0.020 | m |
| Flow area obstruction ratio | 5.0 | % |
| Contraction scour depth | 0.00 | m |
| Local pier scour depth (max) | 3.47 | m |
| Maximum probable scour depth | 4.47 | m |
Local pier scour (HEC-18 Eq. 7.1) (1 rows)
| Nose | Pier width a (m) | Effective width (m) | K1 | K2 | K3 | ys (m) | Rule-of-thumb limit (m) | Coarse-bed eq. (m) | Kw | Scour hole top width each side (m) |
|---|---|---|---|---|---|---|---|---|---|---|
| Round-nose pier | 2.00 | 2.00 | 1.00 | 1.000 | 1.10 | 3.47 | 4.80 | — | — | 6.95 |
Stream pressure and pier riprap (1 rows)
| Nose | Stream pressure resultant (kN) | Height of action (m) | Riprap K2 | Riprap d50 (m) | Extent (m) | Thickness (m) |
|---|---|---|---|---|---|---|
| Round-nose pier | 11.7 | 2.35 | 1.70 | 0.638 | 4.00 | 1.91 |
Assumptions and Limits Stated by the Calculation Core
- Soffit freeboard is checked only against a user-specified threshold (min_clearance_m). The 600 mm figure in UK legislation (S.I. 2016/475, Schedule 1, Footbridges) is an exemption condition for small footbridges (length up to 8 m, deck width up to 1.5 m) and is measured above the top of both banks of the main river; it is not a general soffit freeboard standard relative to flood level.
- Pier riprap: where the velocity adjustment factor K2 for the pier location is not given, the upper bound 1.7 of the HEC-23 DG 11 Eq. 11.2 range is used (main current around a sharp bend; conservative). It may be as low as 0.9 for a pier near the bank in a straight reach; enter riprap_k2 according to the pier location in the channel
- The minimum pier riprap thickness is the greatest of 3·d50, contraction scour plus long-term degradation, and the bedform trough depth (HEC-23 DG 11 §11.6.1, Fig. 11.15); increase the thickness by 50% where placed under water, and provide a filter beneath the riprap (geotextile extending over 2/3 of the riprap extent)
- No abutments entered: local abutment scour was not checked in this run, and the results do not indicate that the abutment foundations have been checked. Where an abutment is in or near the main channel, or the embankment obstructs overbank flow, enter the abutment data for a check per HEC-18 Chapter 8
- Flow area obstruction ratio 5.0% (projected pier width 4.00 m). MOTC (Taiwan) Highway Drainage Design Code (2018) 7.4 only requires spans as long as practicable to reduce obstruction and sets no numeric limit; the Taiwan Directions for Reviewing River-Crossing Structures (amended 2024-01-09) define the flow area obstruction ratio in Point 2(11) without a limit, and the 7% in the former notice was a condition for omitting the hydraulic analysis that the current directions have deleted, so the ratio is listed only
- Hydraulics use an equivalent rectangular section at the bridge; the Yarnell equation reflects pier losses only, without abutment contraction or approach embankments (where abutments clearly contract the channel, use a multi-section energy or momentum analysis). Long-term bed degradation and mobile bed layer thickness are input values
2. Frequently Asked Questions
Common questions about this calculator are answered below. Final sign-off remains the responsibility of the chartered or registered engineer.
Which design basis does this calculator apply?
FHWA HEC-18 5th Ed. (2012) Eqs. 6.1–6.4, 7.1–7.4, 7.32, 7.34; HEC-RAS Hydraulic Reference Manual Eq. 5-4 (Yarnell); FHWA HEC-23 Design Guideline 11. Scour and backwater are computed with the FHWA equations named in the basis line. The low-chord freeboard classes in the input list and the obstruction-ratio note in the results are Taiwan rules; check the requirements of your own authority separately.
What assumptions and limits does the calculation core state for this tool?
Soffit freeboard is checked only against a user-specified threshold (min_clearance_m). The 600 mm figure in UK legislation (S.I. 2016/475, Schedule 1, Footbridges) is an exemption condition for small footbridges (length up to 8 m, deck width up to 1.5 m) and is measured above the top of both banks of the main river; it is not a general soffit freeboard standard relative to flood level. Pier riprap: where the velocity adjustment factor K2 for the pier location is not given, the upper bound 1.7 of the HEC-23 DG 11 Eq. 11.2 range is used (main current around a sharp bend; conservative). It may be as low as 0.9 for a pier near the bank in a straight reach; enter riprap_k2 according to the pier location in the channel. The minimum pier riprap thickness is the greatest of 3·d50, contraction scour plus long-term degradation, and the bedform trough depth (HEC-23 DG 11 §11.6.1, Fig. 11.15); increase the thickness by 50% where placed under water, and provide a filter beneath the riprap (geotextile extending over 2/3 of the riprap extent). No abutments entered: local abutment scour was not checked in this run, and the results do not indicate that the abutment foundations have been checked. Where an abutment is in or near the main channel, or the embankment obstructs overbank flow, enter the abutment data for a check per HEC-18 Chapter 8. Flow area obstruction ratio 5.0% (projected pier width 4.00 m). MOTC (Taiwan) Highway Drainage Design Code (2018) 7.4 only requires spans as long as practicable to reduce obstruction and sets no numeric limit; the Taiwan Directions for Reviewing River-Crossing Structures (amended 2024-01-09) define the flow area obstruction ratio in Point 2(11) without a limit, and the 7% in the former notice was a condition for omitting the hydraulic analysis that the current directions have deleted, so the ratio is listed only. Hydraulics use an equivalent rectangular section at the bridge; the Yarnell equation reflects pier losses only, without abutment contraction or approach embankments (where abutments clearly contract the channel, use a multi-section energy or momentum analysis). Long-term bed degradation and mobile bed layer thickness are input values.
Where is the calculation performed, and can the result be sealed or submitted?
The calculation runs in your browser, in the same WebAssembly calculation core this page loads. The result is an online preview: its first line reads "[HyGeoWorks online preview - not for PE sealing or submittal]".
Can I recalculate without a network connection?
Yes. "Download the offline workbench" on this page saves one HTML file that contains the workbench and the same calculation core; opened from disk it recalculates without a network connection.
3. Explore All 30 Calculators (SI Edition; Design Basis Stated on Each Page)
Each calculator below states its own design basis on its page; several apply Taiwan regulations and say so.