Check Summary Preview (Software Format; Auto-Populated)
| Check item | Trial value | Status |
|---|---|---|
| Wall flexural strength φMn ≥ LF·Mmax | 851.7 kN·m/m ≥ 518.2 | OK |
| Wall shear strength φVn ≥ LF·Vmax | 833.6 kN/m ≥ 273.1 | OK |
| Max wall deflection ≤ 0.50% of final excavation depth (control value) | 6.3 mm ≤ 40.0 | OK |
- UK note (CDM 2015) — CDM Regulations 2015 reg. 22 (excavations), reg. 19 (temporary supports); BS 5975-1:2024 (code of practice, not legislation): CDM 2015 reg. 19 and reg. 22 apply to excavations of any depth: all practicable steps must be taken to prevent collapse (reg. 22), and temporary supports must be designed for foreseeable loads (reg. 19). BS 5975 is a code of practice; this calculator does not apply its procedures. (No statutory depth threshold; this example: 8.00 m)
Summary of the online calculation (software format) for checking by the designer and an independent checker. Final sign-off remains the responsibility of the chartered or registered engineer.
Desktop edition: calculation reports and cross-module quantity reconciliation
1. Calculation reports: with a licence, the desktop edition writes Word (.docx) and Excel (.xlsx) calculation reports and DXF drawings without the trial watermark, listing the inputs, the equations used and the results; in trial mode the step-by-step detail is hidden. For this calculator alone, licensed users can also sign in on the calculator above and formally export a single-tool Word report (with a verification code) and DXF drawing. The Pro plan (all modules) is US$990 per year; see Pricing for monthly, perpetual and team plans.
2. Cross-module reconciliation: desktop project runs carry the design peak flow into downstream channel, culvert and bridge hydraulics; terrain cut/fill into the earthwork balance, cost and carbon tables; structural concrete, formwork and rebar take-off into the cost and carbon tables; slope and excavation safety-factor thresholds into construction monitoring trigger levels.
3. Independent checking engineers, authority reviewers and academics can request a complimentary review or teaching licence (link below).
1. Worked Standard Example (Computed by the Calculation Core)
The worked example below was computed by the calculation core when this page was built; entering the same inputs above reproduces it.
Design Scenario — Standard example (calculation core defaults): The standard example uses the default inputs of the calculation core. Every number below was produced by the core when this page was built; nothing on this page is computed by hand.
The inputs below were passed to the calculation core (WebAssembly) when this page was built; every step, result and check shown here is the core's own output. Basis reported by the core: Taiwan Building Foundation Design Code (2023) commentary 8.7.3, Fig. C8.7-5 elasto-plastic subgrade reaction method; Taiwan Design Code for Concrete Structures (2023; ACI 318-19 framework) Chs. 21, 22
Inputs Passed to the Calculation Core
| Parameter | Value | Unit |
|---|---|---|
| Diaphragm Wall Thickness t | 0.8 | m |
| Wall Toe Depth L (from ground surface) | 18 | m |
| Groundwater Depth on Retained Side | 3 | m |
| Surface Surcharge q | 10 | kPa |
| Layer 1 Bottom Depth | 9 | m |
| Layer 1 Unit Weight γt | 18 | kN/m³ |
| Layer 1 Saturated Unit Weight γsat | 19.5 | kN/m³ |
| Layer 1 Friction Angle φ′ | 32 | ° |
| Layer 1 Cohesion c′ | 2 | kPa |
| Layer 1 Horizontal Subgrade Reaction kh | 20000 | kN/m³ |
| Layer 2 Unit Weight γt | 19.5 | kN/m³ |
| Layer 2 Saturated Unit Weight γsat | 21 | kN/m³ |
| Layer 2 Friction Angle φ′ | 34 | ° |
| Layer 2 Cohesion c′ | 5 | kPa |
| Layer 2 Horizontal Subgrade Reaction kh | 26000 | kN/m³ |
| Stage 1 Excavation Depth | 2 | m |
| Stage 2 Excavation Depth | 5 | m |
| Strut 1 Installation Depth | 1 | m |
| Strut 1 Axial Stiffness | 50000 | kN/m/m |
| Strut 1 Preload | 50 | kN/m |
| Stage 3 Final Excavation Depth | 8 | m |
| Strut 2 Installation Depth | 4 | m |
| Strut 2 Axial Stiffness | 50000 | kN/m/m |
| Strut 2 Preload | 80 | kN/m |
| Concrete Strength fc′ | 280 | kgf/cm² |
| Rebar Yield Strength fy | 4200 | kgf/cm² |
| Cover | 9 | cm |
| Main Bar Size (both faces) | D25 (#8) | — |
| Main Bar Spacing | 15 | cm |
| Shear Tie Bar Size | D13 (#4) | — |
| Vertical Spacing of Shear Ties | 25 | cm |
| Horizontal Spacing of Shear Tie Legs | 30 | cm |
| Load Factor on Lateral Earth and Water Pressure LF | 1.6 | — |
| Flexural Stiffness Factor | 0.7 | — |
| Deflection Control Value | 0.5 | % |
Calculation Steps (calculation core output)
[HyGeoWorks online preview - not for PE sealing or submittal]
- Wall thickness t = 0.80 m (effective depth d = 71.0 cm); flexural stiffness EI = 0.70·Ec·Ig = 735153 kN·m²/m
- Envelope max deflection δmax = 6.3 mm; factored max moment Mu = 518.2 kN·m/m (φMn = 851.7); max shear Vu = 273.1 kN/m (φVn = φVc 463.1 + φVs 370.5 = 833.6)
- Provided bars: main bars each face D25@15.0 cm (33.78 cm²/m); shear ties D13 at 25.0 cm vertically and 30.0 cm horizontally
Computed Results (calculation core output)
| Output Parameter | Calculated Value | SI Unit |
|---|---|---|
| Max flexural utilization Mu/φMn | 0.608 | — |
| Max shear utilization Vu/φVn | 0.328 | — |
| Envelope max deflection | 6.3 | mm |
| Factored max moment Mu | 518.2 | kN·m/m |
| Design flexural strength φMn | 851.7 | kN·m/m |
| Factored max shear Vu | 273.1 | kN/m |
| Design shear strength φVn | 833.6 | kN/m |
| Rebar estimate (per m of wall) | 1241.0 | kg/m |
| Concrete (per m of wall) | 14.40 | m³/m |
Verification Checks (calculation core output)
| Verification Check | Computed Value | Criterion | Verdict | Basis |
|---|---|---|---|---|
| Wall flexural strength φMn ≥ LF·Mmax | 851.7 kN·m/m | ≥ 518.2 | OK | Taiwan Design Code for Concrete Structures (2023) |
| Wall shear strength φVn ≥ LF·Vmax | 833.6 kN/m | ≥ 273.1 | OK | Taiwan Design Code for Concrete Structures (2023) |
| Max wall deflection ≤ 0.50% of final excavation depth (control value) | 6.3 mm | ≤ 40.0 | OK | The deflection control value is an input (not a statutory limit; set it from the protection needs of adjacent structures) |
Staged excavation elasto-plastic analysis summary (unfactored) (3 rows)
| Stage | Max deflection (mm) | +Mmax (kN·m/m) | −Mmax (kN·m/m) | Vmax (kN/m) | Passive mobilization (%) | Latest strut force |
|---|---|---|---|---|---|---|
| Stage 1 (2.0 m) | 1.3 | 21.9 | 0.0 | 13.0 | 31.9 | Cantilever |
| Stage 2 (5.0 m) | 2.3 | 37.5 | -141.5 | 64.7 | 41.6 | 73 kN/m |
| Stage 3 (8.0 m) | 6.3 | 79.6 | -323.9 | 170.7 | 56.5 | 202 kN/m |
Assumptions and Limits Stated by the Calculation Core
- Model: the elasto-plastic model of the Taiwan Building Foundation Design Code (2023) commentary 8.7.3, Fig. C8.7-5 - at zero wall displacement both sides carry at-rest earth pressure, which varies linearly with displacement and is limited by the active and passive pressures; surcharge and water pressure are superimposed on the earth pressure
- The horizontal subgrade reaction coefficient kh is an input: the code commentary notes that it is extremely hard to determine and must be judged from monitoring results of many actual sites, so no built-in values are provided. Results are sensitive to kh; a sensitivity analysis and back-analysis from monitoring data are advised
- Active and passive pressures use Rankine (no wall friction or adhesion); undrained layers use total stress (σ ∓ 2su); water pressure on both sides is hydrostatic with no seepage; earth pressure depends only on total displacement, with no unloading-reloading hysteresis
- At-rest pressure on the excavation side is based on the effective overburden stress after excavation (K0·σv′): unloading makes the at-rest pressures on the two sides unbalanced at depth and causes displacement; residual lateral stress after unloading is ignored, which is conservative for displacement at depth
- Not included: strut removal and floor slab construction stages, temperature effects, earthquake, stiffness reduction after wall cracking (reduce EI as appropriate), three-dimensional corner effects; embedment, basal heave, piping and uplift stability are checked separately per 8.8
- Wall reinforcement: the envelope moments of all stages are multiplied by the load factor and the required steel area (per metre width) is found by strength design; shear is compared with the concrete design shear strength; minimum reinforcement, development, lap splices and cage detailing are checked separately
- The flexural stiffness factor 0.70 is an input: for walls, Table 6.6.3.1.1(a) of the concrete code gives 0.70 Ig uncracked and 0.35 Ig cracked; Ec = 15000√fc′ (kgf/cm²)
- Shear strength is φ(Vc + Vs): Vc = 0.53√fc′·b·d; Vs from the entered ties (4.22 cm² per m of wall at 25.0 cm vertical spacing), with tie yield strength capped at 4200 kgf/cm²; minimum shear reinforcement and spacing limits are checked separately
- The rebar quantity is an estimate (not a bar schedule): main bars on both faces over the full depth plus 12% for laps, tie length taken as 90% of the wall thickness; horizontal bars, cage stiffeners and lifting bars are not included
2. Frequently Asked Questions
Common questions about this calculator are answered below. Final sign-off remains the responsibility of the chartered or registered engineer.
Which design basis does this calculator apply?
Taiwan Building Foundation Design Code (2023) commentary 8.7.3, Fig. C8.7-5 elasto-plastic subgrade reaction method; Taiwan Design Code for Concrete Structures (2023; ACI 318-19 framework) Chs. 21, 22. The analysis method and the reinforced concrete checks follow the Taiwan codes named in the basis line. Two soil layers, three excavation stages and two strut levels are modelled. The deflection control value (default 0.5% of the final excavation depth) and the flexural stiffness factor (default 0.70 Ec·Ig) are inputs, not statutory limits. Strengths are entered in kgf/cm².
What assumptions and limits does the calculation core state for this tool?
Model: the elasto-plastic model of the Taiwan Building Foundation Design Code (2023) commentary 8.7.3, Fig. C8.7-5 - at zero wall displacement both sides carry at-rest earth pressure, which varies linearly with displacement and is limited by the active and passive pressures; surcharge and water pressure are superimposed on the earth pressure. The horizontal subgrade reaction coefficient kh is an input: the code commentary notes that it is extremely hard to determine and must be judged from monitoring results of many actual sites, so no built-in values are provided. Results are sensitive to kh; a sensitivity analysis and back-analysis from monitoring data are advised. Active and passive pressures use Rankine (no wall friction or adhesion); undrained layers use total stress (σ ∓ 2su); water pressure on both sides is hydrostatic with no seepage; earth pressure depends only on total displacement, with no unloading-reloading hysteresis. At-rest pressure on the excavation side is based on the effective overburden stress after excavation (K0·σv′): unloading makes the at-rest pressures on the two sides unbalanced at depth and causes displacement; residual lateral stress after unloading is ignored, which is conservative for displacement at depth. Not included: strut removal and floor slab construction stages, temperature effects, earthquake, stiffness reduction after wall cracking (reduce EI as appropriate), three-dimensional corner effects; embedment, basal heave, piping and uplift stability are checked separately per 8.8. Wall reinforcement: the envelope moments of all stages are multiplied by the load factor and the required steel area (per metre width) is found by strength design; shear is compared with the concrete design shear strength; minimum reinforcement, development, lap splices and cage detailing are checked separately. The flexural stiffness factor 0.70 is an input: for walls, Table 6.6.3.1.1(a) of the concrete code gives 0.70 Ig uncracked and 0.35 Ig cracked; Ec = 15000√fc′ (kgf/cm²). Shear strength is φ(Vc + Vs): Vc = 0.53√fc′·b·d; Vs from the entered ties (4.22 cm² per m of wall at 25.0 cm vertical spacing), with tie yield strength capped at 4200 kgf/cm²; minimum shear reinforcement and spacing limits are checked separately. The rebar quantity is an estimate (not a bar schedule): main bars on both faces over the full depth plus 12% for laps, tie length taken as 90% of the wall thickness; horizontal bars, cage stiffeners and lifting bars are not included.
Where is the calculation performed, and can the result be sealed or submitted?
The calculation runs in your browser, in the same WebAssembly calculation core this page loads. The result is an online preview: its first line reads "[HyGeoWorks online preview - not for PE sealing or submittal]".
Can I recalculate without a network connection?
Yes. "Download the offline workbench" on this page saves one HTML file that contains the workbench and the same calculation core; opened from disk it recalculates without a network connection.
3. Explore All 30 Calculators (SI Edition; Design Basis Stated on Each Page)
Each calculator below states its own design basis on its page; several apply Taiwan regulations and say so.