Check Summary Preview (Software Format; Auto-Populated)
| Check item | Trial value | Status |
|---|---|---|
| Infinite Slope Factor of Safety (Rainfall) | 1.456 ≥ 1.2 | OK |
Summary of the online calculation (software format) for checking by the designer and an independent checker. Final sign-off remains the responsibility of the chartered or registered engineer.
Desktop edition: calculation reports and cross-module quantity reconciliation
1. Calculation reports: with a licence, the desktop edition writes Word (.docx) and Excel (.xlsx) calculation reports and DXF drawings without the trial watermark, listing the inputs, the equations used and the results; in trial mode the step-by-step detail is hidden. For this calculator alone, licensed users can also sign in on the calculator above and formally export a single-tool Word report (with a verification code) and DXF drawing. The Pro plan (all modules) is US$990 per year; see Pricing for monthly, perpetual and team plans.
2. Cross-module reconciliation: desktop project runs carry the design peak flow into downstream channel, culvert and bridge hydraulics; terrain cut/fill into the earthwork balance, cost and carbon tables; structural concrete, formwork and rebar take-off into the cost and carbon tables; slope and excavation safety-factor thresholds into construction monitoring trigger levels.
3. Independent checking engineers, authority reviewers and academics can request a complimentary review or teaching licence (link below).
1. Governing Equations & SI Nomenclature
The equations the calculation core applies are summarised below for independent checking.
The equations below summarise the method that the calculation core applies on this page. The design basis it reports is: US EPA SWMM Vol. I §4.4.1 (Green–Ampt); Lumb (1975) / HK GEO Manual §4.4.3; Pradel & Raad (1993); required factor of safety per Taiwan Soil and Water Conservation Technical Regulations Art. 73 (rainstorm condition). The worked example further down lists the core's own calculation steps for the standard example.
2. Worked Standard Example (Computed by the Calculation Core)
The worked example below was computed by the calculation core when this page was built; entering the same inputs above reproduces it.
Design Scenario — 12-Hour Storm on a 30° Residual-Soil Slope (i = 45 mm/h): Evaluate the wetting-front depth and the minimum infinite-slope factor of safety of a 30° slope (Green–Ampt: Ks = 15 mm/h, ψ = 110 mm, θe = 0.41, Se = 0.40; γsat = 20 kN/m³, c' = 8 kPa, φ' = 30°, seepage parallel to the slope) during a 12-hour storm of constant intensity 45 mm/h.
The inputs below were passed to the calculation core (WebAssembly) when this page was built; every step, result and check shown here is the core's own output. Basis reported by the core: US EPA SWMM Vol. I §4.4.1 (Green–Ampt); Lumb (1975) / HK GEO Manual §4.4.3; Pradel & Raad (1993); required factor of safety per Taiwan Soil and Water Conservation Technical Regulations Art. 73 (rainstorm condition)
Inputs Passed to the Calculation Core
| Parameter | Value | Unit |
|---|---|---|
| Infiltration Model | Green–Ampt / Mein–Larson | — |
| Soil Texture | Custom Ks, ψ, θe | — |
| Saturated Conductivity Ks | 15 | mm/h |
| Wetting Front Suction Head ψ | 110 | mm |
| Effective Porosity θe | 0.41 | — |
| Initial Effective Saturation Se | 0.4 | — |
| Rainfall Pattern | Constant intensity | — |
| Mean Rainfall Intensity i | 45 | mm/h |
| Duration | 12 | h |
| Time Step | 0.5 | h |
| Slope Angle β (deg) | 30 | ° |
| Saturated Unit Weight γsat | 20 | kN/m³ |
| Cohesion c' | 8 | kPa |
| Friction Angle φ' | 30 | ° |
| Pore Pressure in Wetted Zone | Saturated, seepage parallel to slope (m = 1) | — |
| Slope Category | Permanent / Long-Term | — |
Calculation Steps (calculation core output)
[HyGeoWorks online preview - not for PE sealing or submittal]
- Green–Ampt: Ks = 15.00 mm/h, ψ = 110.0 mm, θd = θe(1 − Se) = 0.410×(1 − 0.4) = 0.2460; Pre-ponding f = i, F reaches ponding threshold Fs = Ks·ψ·θd/(i − Ks); post-ponding solved step-by-step via F2 − ψθd·ln(F2 + ψθd) = Ks·Δt + F1 − ψθd·ln(F1 + ψθd)
- Wetting front depth h = F/θd; Infinite slope FS = [c' + (γsat·h·cos²β − u)·tanφ']/(γsat·h·sinβ·cosβ), u = 1·γw·h·cos²β
Computed Results (calculation core output)
| Output Parameter | Calculated Value | SI Unit |
|---|---|---|
| Final Wetting Front Depth h | 0.976 | m |
| Cumulative Infiltration F | 240.0 | mm |
| Minimum Slope FS | 1.456 | — |
| Time of Minimum FS | 12.00 | h |
Verification Checks (calculation core output)
| Verification Check | Computed Value | Criterion | Verdict | Basis |
|---|---|---|---|---|
| Infinite Slope Factor of Safety (Rainfall) | 1.456 | ≥ 1.2 | OK | Taiwan Soil and Water Conservation Technical Regulations Art. 73 (rainstorm condition); the infiltration model is a method based on established theory (Art. 209) |
Infiltration & Slope Stability Time History FS(t) (12 rows)
| t (h) | i (mm/h) | F (mm) | h (m) | FS |
|---|---|---|---|---|
| 1.00 | 45.0 | 35.9 | 0.146 | 6.840 |
| 2.00 | 45.0 | 59.5 | 0.242 | 4.328 |
| 3.00 | 45.0 | 80.4 | 0.327 | 3.338 |
| 4.00 | 45.0 | 99.9 | 0.406 | 2.785 |
| 5.00 | 45.0 | 118.6 | 0.482 | 2.426 |
| 6.00 | 45.0 | 136.8 | 0.556 | 2.171 |
| 7.00 | 45.0 | 154.6 | 0.628 | 1.980 |
| 8.00 | 45.0 | 172.1 | 0.699 | 1.830 |
| 9.00 | 45.0 | 189.3 | 0.770 | 1.710 |
| 10.00 | 45.0 | 206.4 | 0.839 | 1.611 |
| 11.00 | 45.0 | 223.2 | 0.908 | 1.527 |
| 12.00 | 45.0 | 240.0 | 0.976 | 1.456 |
Assumptions and Limits Stated by the Calculation Core
- Saturated wetted zone with seepage parallel to the slope (m = 1; Pradel & Raad 1993); Taiwan regulations give no numerical procedure for rainstorm infiltration; this tool is an engineering model
3. Regional Design Options in This Edition: UK, EU, Singapore, Malaysia, Hong Kong & Australia
Symbols and units are SI unless stated otherwise.
- This calculator: the design basis is the one reported by the calculation core: US EPA SWMM Vol. I §4.4.1 (Green–Ampt); Lumb (1975) / HK GEO Manual §4.4.3; Pradel & Raad (1993); required factor of safety per Taiwan Soil and Water Conservation Technical Regulations Art. 73 (rainstorm condition). The options listed below belong to the calculators named in each item.
- United Kingdom, Ireland & European Union: The retaining wall and slope stability calculators default to EN 1997-1:2004 Design Approach 1 (Combination 1 & Combination 2); the UK National Annex and 2nd-Gen EN 1997-1:2024 / EN 1997-3:2025 (MFA, and RFA for retaining walls) are selectable there, as are DA2 for retaining walls and DA3 for slopes. The retaining wall calculator lets γG, γQ and γφ' be overridden for a National Annex and designs metric H-bars (H10–H32) when concrete and steel strengths are entered.
- Singapore & Malaysia: The retaining wall calculator offers SS EN 1997-1:2010 with the Singapore National Annex, and the detention calculator offers a DID Malaysia MSMA 2nd Edition (2012) Equation 2.2 IDF rainfall mode besides directly entered design intensities.
- Hong Kong SAR: HyGeoWorks does not claim Hong Kong Buildings Department pre-accepted program status; the retaining wall calculator's HK GEO Geoguide 1 option shows the calculation core's steps and checks so that the result can be checked independently. With that option the calculation core applies the Geoguide 1 Table 6 and Table 7 partial factors at ULS and the §9.2.4 middle-third eccentricity check at SLS.
- Australia & New Zealand: No ARR 2019 IFD data is built in; design rainfall intensities for any AEP can be entered directly in the detention calculator. The HydroStudio desktop edition supports GDA2020 / MGA2020 zones 46–59 as well as WGS 84 / UTM zones.
4. Frequently Asked Questions
Common questions about this calculator are answered below. Final sign-off remains the responsibility of the chartered or registered engineer.
What does the calculator check?
It computes the wetting-front depth and the infinite-slope factor of safety at each time step and checks the minimum FS against the required value of Taiwan Soil and Water Conservation Technical Regulations Art. 73 for the rainstorm condition, as reported by the calculation core. The core also notes that those regulations give no numerical procedure for rainstorm infiltration, so the infiltration part is an engineering model.
When should I select Lumb (1975) rather than Green–Ampt?
The Lumb wetting band neglects the suction at the wetting front and advances the front by gravity alone, h = k·t/[n(Sf − So)]. Green–Ampt includes the suction head ψ, which speeds up early infiltration in finer soils. Running both shows how sensitive the result is to the infiltration model.
Should I model seepage parallel to the slope (m = 1) or no positive pore pressure (m = 0)?
Where a less permeable layer below the wetted zone lets a perched water table form, seepage parallel to the slope (m = 1) develops positive pore pressure. Where water can drain freely downward, the wetted zone loses suction without positive pore pressure (m = 0).
Can the analysis be extended to two dimensions?
The HydroStudio desktop edition includes a 2D finite-element variably saturated seepage analysis (Richards equation with a van Genuchten soil-water characteristic curve) whose pore-pressure field can be used in Bishop, Spencer, Morgenstern–Price and Janbu slope stability analyses.
5. Explore All 30 Calculators (SI Edition; Design Basis Stated on Each Page)
Each calculator below states its own design basis on its page; several apply Taiwan regulations and say so.